1 / 1

LFTE Report to Congress

Production and Deployment Phase. JITC Interoperability Certification Testing. Independent IOT&E. OTRR. Full-Up System Level LFT&E. J-6 Interoperability & Supportability Validation. Test Results Exit Criteria APB • CPD • SEP • TEMP Product Support Element Requirements.

Download Presentation

LFTE Report to Congress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production and Deployment Phase JITC Interoperability Certification Testing Independent IOT&E OTRR Full-Up System Level LFT&E J-6 Interoperability & Supportability Validation • Test Results • Exit Criteria • APB • CPD • SEP •TEMP • Product Support Element Requirements • Production Baseline • Test Reports ▪ LCSP • TEMP • PESHE• SEP • Input to: • - Cost/Manpower Est. • - Product Support Package PCA Verify & Validate Production Configuration Analyze Deficiencies To Determine Corrective Actions Modify Configuration (Hardware/Software/Specs) To Correct Deficiencies BLRIP Report to Congress LFTE Report to Congress Milestone C FRP DR Independent IOT&E OUTPUTS INPUTS

More Related