1 / 2

No GF

Balancing Authority Area Transmission Service Cost Estimates. No GF. WAPA. So GF. B-M. E Bil. Boz-Bil. Transmission Cost Attributable To 2 5 MW Project.

cain-henry
Download Presentation

No GF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Balancing Authority Area Transmission Service Cost Estimates No GF WAPA So GF B-M E Bil Boz-Bil

  2. Transmission Cost AttributableTo 25 MW Project 1. Assumes the project is injecting its power a the Great Falls 230 Switch Yare. Should a project connect on one of 100 kV lines in the south of Great Falls transmission system, there is a likelihood that the 100 kV would need to be reconductored.

More Related