Balancing Authority Area Transmission Service Cost Estimates. No GF. WAPA. So GF. B-M. E Bil. Boz-Bil. Transmission Cost Attributable To 2 5 MW Project.
E N D
Balancing Authority Area Transmission Service Cost Estimates No GF WAPA So GF B-M E Bil Boz-Bil
Transmission Cost AttributableTo 25 MW Project 1. Assumes the project is injecting its power a the Great Falls 230 Switch Yare. Should a project connect on one of 100 kV lines in the south of Great Falls transmission system, there is a likelihood that the 100 kV would need to be reconductored.