1 / 5

Controls for LHC startup

Controls for LHC startup. E. Hatziangeli Sep . 2008. Timing No issues. New versions of the LHC gateway RT task, LTIM and CBCM performed correctly without any problems XTIM rock solid! Access to equipment - Equipment servers (FESA/CMW) BT, Collimators, RF OK BI

cais
Download Presentation

Controls for LHC startup

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Controls for LHC startup E. Hatziangeli Sep. 2008

  2. Timing • No issues. New versions of the LHC gateway RT task, LTIM and CBCMperformed correctly without any problems • XTIM rock solid! Access to equipment - Equipment servers (FESA/CMW) • BT, Collimators, RF OK • BI • BLM OKBPM some FEs instabilities observed by the concentrator – BI investigates • Observed BCT, BTVs,, BSRT,.. FEs accessed by several clients => degradation of FEs • Solution with CMW fanout GW (one cliet access the FE) is being investigated - deployed asap • PO stable • New CMW release today to correct rare bug (asynchronous CMW commands) causing crashes E. Hatziangeli Sep. 2008

  3. Logging • Full logging on all systems applied => No data loss, no issues observed • General logging • LHC Collimators • BPM logging • BLM logging • FGCs – 0.5Hz fixed rate + on change Database • Timber was used extensively => lots of queries => high CPU usage • Investigating solutions to spread the system load over allof the hardware resources in the cluster RBAC settings • RBAC-policy = lenient • RBAC behaved correctly during the test • Last minute OP decision to use “Public” Consoles in the center of LHC bay for LHC Operations => had to be quickly authorized for operations • Plan to move to stricter policy soon for PO and BI • Property protected : token needed and rule is checked • Property not protected : grant and no token needed E. Hatziangeli Sep. 2008

  4. Looking into …. • High load on consoles – CCM visual indicator to be implemented • Certain GUI applications take a lot of resources – being investigated • JMS service does not handle well misbehaving clients – exponential backup will be implemented in JAPC • FESA/CMW consolidation continues – less critical bugs are being addressed • RBAC • automatic renewal of token will be implemented • Improvements on the A1 role picker component • OASIS • Signal configuration – commissioning support of the system • Logging • New requests for logging is being processed (BI, RF, ..) E. Hatziangeli Sep. 2008

  5. Summary • Stable performance of the Controls Infrastructure,no issues on Timing, Logging, Databases, RBAC, FESA/CMW servers, .. • Controls successfully supported the LHC startup E. Hatziangeli Sep. 2008