330 likes | 546 Views
BlackDiamond X8* Product Presentation. * Future availability. Agenda. Data Center Market Trends Data Center Network Challenges Introducing BlackDiamond ® X8* Summary. * Future availability. The New Enterprise… A New Mobility. Inflection in 2012 Smartphones > PCs.
E N D
BlackDiamond X8* Product Presentation * Future availability.
Agenda • Data Center Market Trends • Data Center Network Challenges • Introducing BlackDiamond® X8* • Summary * Future availability.
The New Enterprise… A New Mobility Inflection in 2012 Smartphones > PCs Cloud Services ($B) 600 500 400 300 Global Unit Shipments (MM) Billions $ 200 100 0 2009 2010E 2011E 2012E 2013E Cloud Services Desktop PCs Notebook PCs (includes Netbooks) Smartphones Source: Katy Huberty, Ehud Gelblum, Morgan Stanley Research. Data and Estimates as of 9/10 Source: 451 Group and Tier 1 Research • Revenues from mobile apps, including from those designed for enterprise use, will experience a compound annual growth rate of 60 percent during the next four years. • By 2014 the market is expected to reach $35 billion. • This year mobile application downloads will top 10.9 billion. That will reach 76.9 billion over the next four years. Source: IDC
Data Residing in the Cloud Expected to Grow Recent Network World End-User Survey Q. Approximately, how much of your organization’s data presently resides in the public, private and hybrid clouds, and will in 18 months? Source: Network World Cloud-Based Computing Research Study, November 2010 Source: State of the Network Survey 2010. Network World. August 2010.
Data Center Trends • The New Computer • Data Center Capacity, Not Server Capacity, is the New Metric • Consolidation • High Computational Density • Physical Location Consolidation • Green • Efficient Power Management • Could Ready/Virtualization • On Demand Provisioning • Hardware Independence / High Availability • Location Independence
Technology Trends Servers • Becoming faster with multi-core CPU • VM explosion, 8-16 today 64-128 • Adding multiple 10G interfaces • Converged 10G adapters • VEPA enabled Power • 2-4W per 1Gig 10-30W per 10Gig • Higher power/cooling cost • Green initiative, premium cap and trade • Need for efficient power management Convergence • Storage, HPC move to Ethernet
Technology Requirements Convergence • Converged Ethernet switching fabric Even Fewer Tiers • Much higher non-blocking 10G/40G Lower End-to-End Latency • 10x capacity More Virtualization Support • Physical port virtual port virtual policy/counter Less Power • Efficient PSUs • Power management and monitoring Ease of Management • Same infrastructure, ExtremeXOS®, feature consistency All at Lower Cost
Introducing BlackDiamond X8* The Next Generation Data Center * Future availability.
BlackDiamond X8 Unmatched Switching Capability • 20+ Tbps Switching Capacity • 1.28 Tbps Bandwidth per Slot • 192 x 40 GbE or 768 x 10 GbE Superior Availability • N+1 Switching, Power & Fan Redundancy • N+N Power GRID Redundancy Low Latency • <3 µsec Compact Physical Size • 1/3 Rack • BlackDiamond® X8* 14.5 RU * Future availability.
BlackDiamond X8 Unmatched Virtualization Support • 128K Virtual Machines • VPP • Virtual Machine Lifecycle Management Zero-Touch Configuration Storage Convergence • NFS, CIFS, iSCSI, FCoE Sustainability Metrics • 5W per 10 GbE port • Front-to-back Cooling (FB) • Intelligent Power Management • Variable Fan Speed • BlackDiamond® X8* 14.5 RU * Future availability.
40 Gigabit Ethernet and Data Center Services Powered end-to-end by ExtremeXOS® single modular management infrastructure 24x40G Modules 6x40G Modules 4x40G Uplink BlackDiamond X8* End-of-Row/Aggregation 10G Access/Aggregation 40G Aggregation BlackDiamond® 8800 Summit® X670* End-of-Row/Aggregation 1G/10G Access 10G/40G Uplinks Top-of-Rack 1G/10G Access 10G/40G Uplinks Data Center Bridging M-LAG Direct Attach™ / VEPA XNV™ OpenFlow* ExtremeXOS® * Future availability.
With Intelligence Driven by Software Moving from a Static Network to a Dynamic DC Network Traffic provisioning/monitoring based on: • Server IP Address • TCP/UDP Port Information • Layer 4 QoS Manual Configuration Traffic provisioning/monitoring based on: • VM or User Identity • Layer 7 Application Info • Layer 7 QoS Automated Configuration Static Dynamic ExtremeXOS® Availability and Intelligence • High availability with hardened operating system and protocols • Intelligence to automate network operations • Proven track record and 10+ years experience in merchant silicon design • Ideal for Data Center networking where servers/apps dynamically provisioned
BlackDiamond X8* Relative Positioning A purpose-built data center chassis with high density, line rate 10/40 GbE for virtualized data centers and high-performance compute cluster Core/Metro/MBH High-scale Routing Data Center Core and Access, High-scale Switching BlackDiamond 8800 with 8900 series modules BlackDiamond X8 BlackDiamond® 8800 with 8900-xl series modules * Future availability.
BlackDiamond X8* Chassis Architecture • BlackDiamond® X8 30” 14.5 RU 17.25” * Future availability. Physical Size • 19-inch rack size, 14.5RU, 30” depth • 8 I/O slots – Horizontal • 2 MM slots - Horizontal • 4 Fabric slots – Rear Vertical • 5 Fan trays – Rear Vertical • 8 PSU slots Performance • 20+ Tbps switching capacity • 1.28 Tbps bandwidth per slot • 192 x 40 GbE or 768 x 10 GbE Availability • 3+1 switching fabric, sustaining 24x40 GbE wire-speed with 960 Gbps/slot under 1 fabric failure • Dual redundant management module • 4+1 fan-tray w/variable fan speed control • N+1 and N+N power redundancy
BlackDiamond® X8* Chassis Front View 8 PSU Slots Dual Management Module Slots 8 I/O Module Slots (Horizontal) Rear View With Fan Trays Rear View 4 Fan Trays Removed • 8 AC Power Input Sockets • 4 Fabric Module Slots • 5 Fan Tray Slots • (Vertical) * Future availability.
High-Level Features and Scalability * Future availability.
BlackDiamond® X8* Modules * Future availability.
BlackDiamond® X Series* Optics Support * Future availability.
Intelligent and Efficient Cooling System Optimized air ventilation • Energy efficient cooling • Pure front to back, air-flow straight through chassis • Midplane-less design efficient cooling • Separation of cold-hot aisle • Variable fan speed control for lower power Intelligently redundant cooling control • 5 fan trays works in 4+1 mode • 6 fans per fan tray works in 5+1 mode • Automatic fabric module shutdown in case of fan failure – I/O modules will stay up
BlackDiamond® X8* Software License • Feature Packs can be applied to both license levels Core License (Option) BGP4/BGP4+, IS-IS for IPv4/v6, OSPFv2/v3-full, MSDP, PIM-DM/SM/SSM, EAPS-full-mode, etc. Direct Attach™Feature Pack (Direct Attach & VEPA) Advanced Edge (Base) MPLS Feature Pack (MPLS, VPLS, H-VPLS) Includes all L2/L3 switching with STP, LAG, M-LAG, EAPS-edge-mode, XNV™, CLEAR-Flow, and RIPv1/v2/ng for IPv4/v6 OFPFv2/v3 edge mode, VRRP, PBR, PIM-SM-edge-mode, etc. * Future availability.
BlackDiamond X8* Application The Next Generation Data Center * Future availability.
Extreme Networks® Open Fabric – 40G Standards Based Up to 4,608 10 GbE Servers Up to 9,000 10 GbE Servers <5 µsec Latency BlackDiamond® X8* Summit® X670* Data Center Bridging M-LAG Direct Attach™ / VEPA XNV™ OpenFlow* ExtremeXOS® * Future availability.
Standard-Based Scalability • Powered by ExtremeXOS® Single Modular OS Data Center Scale Network in a (pair of) Boxes Up to 768 10 GbE Connection Up to 4,500 10 GbE Connection Up to 9,000 10 GbE Connection * Future availability.
ToR and EoR architecture QSFP+ Breakout cable QSFP+ Breakout cable * * QSFP+ Breakout cable 40GBASE-SR4 QSFP+ optics 10GBASE-SR compatible LC connector MTP 40GbE port 40GBASE-SR4 QSFP+ Up to 100-meter * Future availability.
Extreme Networks® Data Center Network in a Box • Single Tier Physical and Logical Network • Supports Up to 768 10 GbE Servers in a Single Switch • Supports 128,000 Virtual Machines in a Single Switch • Heterogeneous Hypervisor Integration • M-LAG Support for “Multi-path” Capability • VEPA Support – Moving Switching Back to the Network • Data Center Bridging for data and storage integration • XNV (ExtremeXOS® Network Virtualization) for VM Mobility Management BlackDiamond® X8* – Data Center in a Box <3 µsec Latency Data Center Bridging M-LAG Direct Attach™ / VEPA XNV™ OpenFlow* ExtremeXOS® * Future availability.
BlackDiamond X8* Architecture The Next Generation Data Center * Future availability.
High-Level Architecture Highly Scalable Data Plane • 20.48 Terabit switching capacity • 1.28 Terabit per slot, 960 Gigabit per slot with 3+1 config • 768-port wire speed 10 GbE, 192-port wire speed 40 GbE • Midplane-less, high-performance mating system High-Performance Control Plane • Dual Core, 2GHz Intel i7 main processor • High-speed control plane, multi-gigabit path to all I/O Fully Redundant Design • Dual management module with hitless failover • 3+1 fabric redundancy to sustain 960 Gbps (1.92 Tbps bidirectional) capacity per slot under one fabric failure • N+1 and N+1 power grid redundancy
Direct Connect Data Path for Ultimate Performance • True Future-Proof Chassis Architecture: No Mid-Data Plane Design
BlackDiamond X8* Summary The Next Generation Data Center * Future availability.
BlackDiamond® X* Summary Industry’s highest-density 40 GbE and 10 GbE switch • For enterprise core and cloud-based data centers 192 wire speed 40 Gigabit Ethernet or 768 10 Gigabit Ethernet ports in one third of a rack • 576 40 Gigabit Ethernet or 2,304 10 Gigabit Ethernet ports per rack More than 20 terabit switching capacity with bidirectional 1.28 terabit per second switching bandwidth per slot • With N+1 lossless switching fabric design Lowest power consumption at 5 watts per 10 Gigabit Ethernet • With pure front-to-back data center optimized cooling and high efficiency, digital power supplies All powered by ExtremeXOS® modular operating system • For high availability and intelligent/automated data center networking * Future availability.
Product Roadmap This product roadmap represents Extreme Networks®current product direction. All product releases will be on a when-and-if available basis. Actual feature development and timing of releases will be at the sole discretion of Extreme Networks. Not all features are supported on all platforms. Presentation of the product roadmap does not create a commitment by Extreme Networks to deliver a specific feature. Contents of this roadmap are subject to change without notice.