High Level : Generic Test Process (from chapter 6 of your text and earlier lesson). Test Planning & Preparation. Test Execution. Goals met?. NO. YES. EXIT. Analysis & Follow-up. Test Planning & Preparation (important but not always fully performed).
E N D
High Level: Generic Test Process(from chapter 6 of your text and earlier lesson) Test Planning & Preparation Test Execution Goals met? NO YES EXIT Analysis & Follow-up
Test Planning & Preparation(important but not always fully performed) • Two important items in a test plan include: • Specifying Test Goals & Targets in terms of: • Reliability • Performance • Customer satisfaction • etc. • Set General Test Strategy whichincludes: • What & how much to test • Techniques of testing • Tools needed • Measurements and Analysis (details of) • People & Skills • Schedule Setting goals also sets the exit criteria & possibly guides the testing strategy
Testing model • Part of Test Strategy is to decide on a testing model via: • Collecting information to address & choose a test model • Usage –based testing (info on customers’ actual usage pattern) • White-box testing (guided by black box testing results) • Mutation testing (programming language, past experience, etc.) • Analyzeand construct the appropriate test model & techniques • Validate the model and incrementally improve the model for continuous usage • From the Test model then develop test cases: • static test cases: whole/partial program; inputs; etc • dynamic test runs: whole/partial execution; artificial stop points; etc.
Sample 1: Model from “past” data of your group Percentage Breakdown of Problem Discovery and Fixes 40% How would you use this for planning? 25% Problems Detected 15% 10% 10% customer reported Reviews Functional test Component test System test
Sample 2: Model from “past” data of your group Percentage Breakdown of Problem Discovery and Fixes How would you use this for planning? Problems Detected 50% 30% 10% 10% test Technique 2 test Technique 3 customer reported test Technique 1
Sample 3: Distribution of Error Prone AreasRelease 1 customer reported bugs How would you use this for planning Release 2 testing? Problems Detected F1 F3 F4 F5 F5 F2
Test Suite and Test Procedure Preparation • Test case development is based on, besides test model, a broader functional area such as a usage-scenario which may be composed of several steps --- thus several related test cases needs to be prepared as a test suite • Test suites needs to be “managed” (with test mgmt tools) • Categorized • Stored • Reused • Test Procedure Preparation (especially important for component & system tests): • Sequencing of test case execution : based on some relationship (safety-hazard to avoid accidents, usage scenario, etc.) • Problem fix between related test cases : ensure timely fixes for a problem found in the middle of a sequence of test cases or test suite . Developers and testers need to be in synch --- no early release of developers
Don’t Froget: Test Risks and Contingencies • Examples of Risks: • Changes to original requirements or design • Lack of available and qualified personnel • Lack of (or late) delivery from the development organization: • Requirements • Design • Code • Late delivery of tools and other resources • State the contingencies if the Risk item occurs • Move schedule • Do less testing • Change/relax the goals and exit criteria
Sample: Recording Test Case & Test suites • Test Case number (use some scheme as your text book shows ) • Test Case author • A general description of the test purpose • Pre-condition: “includes test results of other pre-req modules” • Test inputs • Expected outputs (if any) • Post-condition • Test Case history: • Test execution date • Test execution person • Test execution result (s) : Pass Fail • If failed : Failure information : fix status
Test Execution • Allocating • Test time • People resources and • Tools (test tools and test systems) • Execution • Load the system to be tested • Invoke and run the test cases (input data as needed) • Collecting test result data and measurements • Results analysis • Identify failure/success • Collect & Record failure information • Submit failed test cases to development (coder/designer) Actually, of preparation & execution
Test Result Checking & Reporting • Basically comparing against expected test result as stated in the test case descriptions. • Some specific behavior or sequence may require one to refer back to requirements document or even user. (especially if the test case description is not complete) • “Good” problem descriptions can help in: • Clearer understanding of the problem • Aid in problem diagnosis and location of problem • Even possibly in problem fix • Non-functional problem such as “consistency or looks” may require experienced tester to analyze
Collecting Test Measurements • In-project measurements ---- • helps us decide if we reached the goal and can stop testing • What and how much to test for system regression • Post project measurements --- helps classify • Defect types • Defect severity • Impact areas • etc. The measurements and analysis provide us with assessments of : - product reliability, - test coverage - etc.
Test - Human Resources (QA Professional) • Test Planning (experienced people) • Test scenario and test case design ( experienced people and test discipline educated) • Test execution (semi-experienced to inexperienced) • Test result analysis (experienced people) • Test tool support (experienced people) • Test Organization: • Vertical model by each product (small organizations) • Horizontal model (large enterprises) • May include external people: • Users • Industry experts (for COTs )
“Clearing a Career Path for Software Testers” byE. J. Weyuker, T.J. Ostrand, J. Brophy and R. Prasadin IEEE Software March/April 2000 • Describes a Software Test Professional Development Program in AT&T • Basic knowledge includes: computing systems and architecture, software development process, operating system, database & quality principles • Tester skills in: Career Path • Test planning - Test Apprenticeship • Test case design - Test Engineer (Mastery of some skills) • Test execution - Test Specialist (expert in some skill) • Test data adequacy analysis - Test Leader • Test automation - Test Manager or Enterprise Tester
TestAutomation • Test case Generation – hardest area • Test plan and management – semi-automatic versions exist • Test execution – keystroke capture and replay has been popular for years • Test result analysis – some compare analysis to designate simple pass/fail • Test coverage – lots of tools Check out some test tools such as HP/Mercury and others --- via on-line search