200 likes | 303 Views
Preactor. BCT Preactor Interface v11. A tour of the integration between Macola ES / Progression and Preactor V11. About BCT.
E N D
Preactor BCT Preactor Interface v11 A tour of the integration between Macola ES / Progression and Preactor V11
About BCT Since 1984, Business Computer Technologies, Inc. has recognized the importance of utilizing current technology within the business processes of companies in the manufacturing and distribution markets. BCT also recognized that in order to provide the best solutions, we needed to have the fundamental skills that enable us to pass on knowledge to the customers we serve. We continue to deploy this business philosophy through the implementation and support of back-office and add-on solutions that provide the highest level of ROI for our customers. In 2003, BCT partnered with Preactor International and Quinn & Associates to provide integration to a World Class Finite Capacity Graphical Scheduling system to our clients.
BCT Preactor Interface v11 The BCT Preactor Interface provides a complete interface between Macola ES / Progression (SQL) and the Preactor V11 Graphical Finite Capacity Scheduling system. The BCT Preactor Interface is bi-directional movement of data. Initially, we draw upon the current orders in the Production Order or Production Order modules, then the production planner is allowed to fine tune the schedule to match your needs, and lastly the information is updated in Macola.
Preactor Download Touch Points
Download to Preactor Touch Points Information that is utilized from the Production Order records when creating records in Preactor. Order No Order Status Start Date End Date Location Qty Remaining Value added cost Type Location Order Pegging
Download to Preactor Touch Points Information that is utilized from the Production Order captured Bill of Material records when creating records in Preactor. Item Number Qty Required
Download to Preactor Touch Points Information that is captured from the Preactor uploads to assist in maintaining the continuity of prior finite capacity plans. Locked Operation Resource Group Required Resource Start Date / Time End Date / Time
Preactor Smart Material Pegging
Smart Material Pegging Manufacturing order operation’s earliest start date is established from the material availability. Materials that can be pegged from current inventory stock levels are assigned an earliest start date of today. Materials that can be pegged from purchase orders are assigned an earliest start date from the request / promised date. Remaining materials are assigned an earliest start date from today’s date plus the PO Lead time.
Preactor Upload from Preactor Touch Points
Upload from Preactor Touch Points Information that is utilized from Preactor to update the Macola ES / Progression Production Order records. Start Date End Date
Upload from Preactor Touch Points To allow the information to be captured for future Preactor schedules Locked Operation Resource Group Resource Start Date / Time End Date / Time
Preactor Configuration Options
Configuration Options General Options: ERP Software Preactor Version Macola ES - SF Macola ES - POP Progression - SF Progression - POP Version 10 Version 11
Configuration Options Download Options: Upload locked operations Download BOMs Exclude operations X days in the future Resources Resource Groups Secondary Constraints Hours Selection: Labor Hours Machine Hours Greater of Labor or Machine Hours
Configuration Options Upload Options: Update Start Dates on Production Order records Update Due Dates on Production Order Header records
Configuration Options SQL Server Options: Server Integrated Security User name Password Database
Configuration Options Macola Download Options: Include Unreleased Orders Start Date from material availability rather than from the operation start date Select warehouses Macola Upload Options: Update Production Order User Defined Fields with original scheduled dates Export Preactor Material Pegging information to u_BCT_Preactor_Pegging table
Configuration Options Resource GroupResource Location VAC Type Location VAC Type None
BCT Preactor Interface V11 The BCT Preactor Interface is the bridge that connects your Macola ES / Progression system with the most advanced finite capacity scheduling system in the world.