70 likes | 321 Views
Pre Construction. Conceptual PlanningSchematic DesignDesign DevelopmentContract Documents. 2. Conceptual Planning. To proceed with project or notSelect siteEstablish a programConceptual estimateMaster scheduleSelect designer and construction manager. 3. Schematic Design. 30% design completio
E N D
1. Project Chronology Pre construction
Procurement
Construction Phase
Project Closeout 1
2. Pre Construction Conceptual Planning
Schematic Design
Design Development
Contract Documents 2
3. Conceptual Planning To proceed with project or not
Select site
Establish a program
Conceptual estimate
Master schedule
Select designer and construction manager 3
4. Schematic Design 30% design completion
Alternative design solutions
Alternative materials and systems
Value engineering
Establish the work/bid package
Long lead items
Move into design development with a single vision 4
5. Design Development 30% to 60% design completion
Evaluation and finalization of all architectural components and project systems
Identifying potential contractors
Preparing for necessary permits 5
6. Contract Documents Preparing working drawings and specs.
Prepare owner estimate
Cash flow analysis
Constructability
6
7. Procurement Bidding and award
Public advertisement/invite pre qualified contractors
Review bids
Select the best bid and award the contract 7