An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRAINING METHODOLOGY & OBJECTIVESFeb. 9-10, 2010

  2. Outline Introductions LBS-G Training Schedule Governing Deliverables Logistics & Maintenance Support Plan LORA O-level and D-level Repair Centers Manpower & Training Assessment JTA & JQR Navy ILE MIL SPEC 24784 LSA 036: PCMT S1000D Manual & DMRL Coding Safety Assessment TBE Expectations

  3. Schedule • DVT-3: 19 -27 Apr • IETM 50% Review: 13-15 Apr • IETM 100% Validation: 12-15 Jul * • Conduct O&M Trng: 22 Jun – 9 Jul • M-Demo: 12-16 Jul * the IETM is needed for O&M Training in June

  4. Governing Deliveries A018 – Software Design Specifications A045 – Integrated Logistics Support Plan A050 – Recommended Spares A056 – Maintenance Support Plan A057 – Manpower & Personnel Report A058 – Job Task Analysis A059 – Job Qualification Requirements A061 – Test Package

  5. Logistic Engineering • LORA • O-Level (Ashore & At-Sea Node) • Manpower & Training Assessment • JTA & JQR • Safety Assessment

  6. LSA 036 PCMT

  7. LSA 036 PCMT

  8. Data Modules Technical Manual Build Process • MIL DTL 24784/22 • Outlines Chapters IM (Info Modules) & IP (Info Packages) • SPEC OUTLINE • Organizes DMRL into Locations within IETM • DMRL • Data Module Requirements Listed per S1000D IC/V Code

  9. S1000D DMRL

  10. S1000D DMRL

  11. S1000D DMRL

  12. S1000D DMRL

  13. TBE Expectations • Content Based Procedures • Step-by-Step Procedures IAW DMRL Task * • Warnings, Cautions, & Notes * • Fault Isolation • Flight Characteristics • Sanity Checks • Operations & Maintenance Objectives • Terminal Learning Objectives * • Enabling Learning Objectives * • PPT. or Pictures as Available • * (word is acceptable, pdf is not) DUE: 26 MAR

  14. References • LBS-G Program Documents. https://portal/cmp/sites/glider/default.aspx • Rutgers SharePoint Working File (includes current PCMT, JTA, JQR, etc..): http://portal/cmp/sites/glider/Shared%20Documents/Forms/AllItems.aspx?RootFolder=%2fcmp%2fsites%2fglider%2fShared%20Documents%2fWorking%20Groups%2fLog%20Engineering%20%2d%20Maintenance%2fWorking%20Files%2fRutgers%2dReview&FolderCTID=&View=%7bDC3E5D5B%2dC433%2d4C54%2dAB09%2d17A3662E99A8%7d • US Navy ILE. https://ile-help.nko.navy.mil/ile/content/policy/handbook.aspx • LORA Background. http://www.mtain.com/logistics/loglora.htm • S1000D Background. http://www.s1000d.net/ • MIL Specs. http://www.everyspec.com/