1 / 13

Updating the Assessment Criteria for National Technical Qualifications in Korea

2011 INAP Conference Workshop IV. Updating the Assessment Criteria for National Technical Qualifications in Korea. Authors: Seung-Il Na, Dong- yul Jung and Hye-kyung Lim Presenter: Dong- yul Jung Seoul National University Department of Vocational Education and Workforce Development

carlj
Download Presentation

Updating the Assessment Criteria for National Technical Qualifications in Korea

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2011 INAP Conference Workshop IV Updating the Assessment Criteria for National Technical Qualifications in Korea Authors: Seung-Il Na, Dong-yul Jung and Hye-kyung Lim Presenter: Dong-yul Jung Seoul National University Department of Vocational Education and Workforce Development jdy83@snu.ac.kr

  2. Contents I Introduction II Methods III Results IV Conclusions and Implications

  3. I. Introduction National Technical Qualifications(NTQ) of Korea In1973, enacting and declaring legal basics for NTQs ☞ Legal basic of NTQs: the National Technical Qualification Act In 2007, introduce the sunset period Professional Engineer Master Craftsman In 2010, operating 512 NTQs Engineer Industrial Engineer ☞ 481 NTQs in technical skills fields, 31 NTQs in service and clerical fields. ☞ 25 job areas, 114 sub job areas Craftsman Current Levels of NTQs in the technical skills fields Levels in service and clerical fields consist 1~3 or 1~2

  4. I. Introduction Assessment criteria / sunset period Assessment criteria ☞ Each of the NTQs has the assessment criteria except certificate of professional engineer ※ certificate of professional engineer has covered all range of technic Set up the sunset period ☞ regulated by a law in updating the assessment criteria ☞ a minimal period to update ☞ Each of the sunset period was set up 2~5 year ※ through gathering the opinions of the experts in ‘The assessment criteria development committee’

  5. I. Introduction Needs for Study The assessment criteria is played key role in NTQ ☞ The assessment criteria indicate the range of subject assessment ☞ regulation to develop assessment criteria for the enactment ☞ revision of the each qualification in accordance with the National Technical Qualifications Law Various efforts to updating the assessment criteria ☞ set up the sunset period in each assessment criteria to improve field suitability of the criteria ☞ the job analysis is carried out by field specialists in developing the assessment criteria, and since 2005 the employment of the NCS was expanded. circumstantial changes about NTQ ☞ It has been five years since the sunset period system was introduced ☞ the development of the NCS and its employment ☞ Technology has been changed Reviewing the status of using the assessment criteria/ Developing new update scheme for Assessment criteria

  6. II. Methods Methods Analysis ☞ literature review - precedent studies on the assessment criteria, policy documents and statistical resources ☞ interview - for figure out the actual condition - six staffs in HRD Korea(which was in charge of assessment), two specialists for developing the assessment criteria and two exam writers. ☞ survey - for find out the suitability of assessment criteria sunset period by types - complete enumeration(The assessment criteria development committee member) comprised of 52 groups in total with 10 members in each area Development ☞ developing the draft - prepared through the examinations of precedent studies and related law and through the result of current status analysis and investigation research ☞ examine the field suitability / applicability - three staffs in HRD Korea, two specialists for developing the assessment criteria and two exam writers.

  7. III. Results Usage status of the Assessment criteria • Using the job analysis, resources from the NCS • But, confusion of terms as the forms and names of item were different • ex) C.A use the terms likes key item, sub item and detailed sub item • J.A, NCS use the terms likes competency unit, competency unit element and key item respectively • four or five times questions are made to be stocked in the item pool → the questions are selected and verified from the item pool to perform an examination • Lack of the sufficient information about the level of difficult and field suitability for exam writer • ※ 73.7% of the exam writer is academic expert Development of Assesment Criteria Development of the exam questions

  8. III. Results Updated status of the Assessment criteria (1) • The evidence for selecting the sunset period is not enough • suitability of sunset period : too long(25.7%, especially, IT and materials areas), tooshort(7.5%) • requirement to reset the sunset period • reflecting the speed of technical change • Same sub job areas: use the same SME pool for updating job analysis and assessment criteria • Updating at the same time, same areas: ① to prevent the duplication of the A.C • ② to achieve the standardization of the terminology • But, 15 areas (13.2%) out of 114 areas had a different sunset period between the areas • The adjustment of the sunset period between A.C in the same sub job areas was required Suitability of sunset period Different sunset period between the sub job areas

  9. III. Results Updated status of the Assessment criteria (2) • Revision the A.C in 2008~2010: 195types • ※ Due to the expiry of the sunset period: 79.0% • ※ A frequent revision: 21.0% • Requirement to frequent revisions • ※ the sunset period is a minimal period to update • great deviation about the A.C revision each years • ※ ‘11, ’15 year: 154types, ’13 year: 20 types • securing annual budget and splitting up the work are difficult • ※ special person in charge is overwork in special year • ※ the lack of appropriateness about securing annual budget • for revising the A.C Updating the A.C Due to the expiry of the sunset period 21.0% A frequent revision 79.0% deviation about the A.C revision

  10. III. Results Direction of improvement and new update scheme for Assessment criteria(1) • the rename of the name of items for use the NCS • ※ ex) key item → competency unit • Providing more information(about detailed sub items) to exam writers • the level of difficulty, the level of importance and the level of frequency • reset to reflect the speed of technical change, and the sunset period of the same type of sub job areas • making revision plan (for revising Every year the same number (85~95 types) of the A.C) Revision of the current A.C forms & name of items • reorganization of qualification types for using the NCS • Revision the A.C using the assemble the NCS • ※ Every field has its own standard in the future A scheme to apply the NCS(In updating the A.C ) Reset the sunset period

  11. III. Results Direction of improvement and new update scheme for Assessment criteria(2) Afrequentmonitoring system to review the field applicability • A frequent monitoring system to review the field applicability might be introduced A frequent monitoring (when setting exam questions) Requiring change More than 10% Restart The sunset period Revision the A.C Requiring change less than 10% Revision the A.C 통계DB Assessment Criteria Sunset period

  12. The A.C provide accurate information to users, and contain competency to be applicable to the field the A.C must be reviewed frequently and complemented reflecting newly developed technology But, less frequent revisions, updates were made obligatory after the expiry of the sunset period. Necessary to revise the form and items of A.C, reset the sunset period, adopt the frequent update system to install a frequent monitoring system working together with the sunset period the NCS resources might be employed positively in the update IV. Conclusions & Implications Conclusions Implications

  13. Thank You !!

More Related