Lunch

Lunch. Bryan District Average Construction Cost. Grade Separation $ 10 Million 2 Lane to 4 Lane $ 2.3 Million/ Mile 2 Lane to Super 2 (passing zones) $ 1 Million/ Mile Signal $ 100,000 Freeway – Controlled Access $ 10 Million/ Mile. Programming - Strategies.

carney
Download Presentation

Lunch

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lunch

  2. Bryan District Average Construction Cost • Grade Separation • $ 10 Million • 2 Lane to 4 Lane • $ 2.3 Million/ Mile • 2 Lane to Super 2 (passing zones) • $ 1 Million/ Mile • Signal • $ 100,000 • Freeway – Controlled Access • $ 10 Million/ Mile

  3. Programming - Strategies • Gather data from similar projects • Cost/ mile equivalents • Original plans • TxDOT’s – Roadway Design Manual • “Green Book” (Policy on Geometric Design of Highways and Streets • TxDOT’s – Bridge Design Manual • Site visit • note existing structures • consider topography • Bid tabs and Estimator

  4. General Estimate • Prepare ROW (Item 100) • Pavement • Structures • Bridges • Culverts/ Inlets/ Storm sewer • Items 462 through 466 • Retaining walls • Item 423 • Embankment/ Excavation (Item 132/110) • Signals • Contingency (15-20% subtotal 1) • Mobilization (10% subtotal 2)

  5. Items • ftp://ftp.dot.state.tx.us/pub/txdot-info/des/specs/specbook.pdf (2004 Spec Book) • http://www.dot.state.tx.us/business/avgd.htm (state wide and region specific) • http://www.dot.state.tx.us/insdtdot/geodist/bry/cserve/bidprice/s_0101.htm (Bryan District Low Bid)

  6. Pavement • Main lane • $90/ SY (Flexible) • Frontage/ Ramps • $65/ SY (Flexible) • Urban Arterial • $80/ SY (Rigid)

  7. Structures(400 Items) • Culverts (Item 462) • Reinforced Concrete Pipe (Item 464) • Inlets/ Manholes (Item 465) • Headwalls/ Wingwall (Item 466) • Safety End Treatment (Item 467) • Retaining Walls (Item 423)

  8. Estimating Bridge Type http://www.txdot.gov/business/contractors_consultants/bridge/super_design.htm

  9. Bridge Design Manual Chapters 4 & 5

  10. Bryan District Average Tx Girder = 75/$SF Bryan District Tx Girder Structure = $75/(sq. ft)

  11. Estimator supports generation of cost estimates using cost-based and bid-based techniques. Regional information

  12. Accounts for quantity

  13. Wow! what a great program… but where can I get a copy? • http://www.dot.state.tx.us/business/projects/estimator.htm

  14. Construction Cost = $ 5.9 Million

  15. Construction Bid = $ 20 Million

  16. Estimate = $23.3 Million