Updates of IC work plan 2008-11

Updates of IC work plan 2008-11. GIG leads were requested to update their work plans Responses from most (but not all) GIGs Incorporated in version 3.2 of the Intercalibration work programme (24 September 2008). GIG plan updates. No changes No work planned at GIG level. River GIGs - Alpine.

Download Presentation

Updates of IC work plan 2008-11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updates of IC work plan 2008-11

  2. GIG leads were requested to update their work plans Responses from most (but not all) GIGs Incorporated in version 3.2 of the Intercalibration work programme (24 September 2008) GIG plan updates

  3. No changes No work planned at GIG level River GIGs - Alpine

  4. Updated September 2008 – changes: Planned work on Acidification dropped Macrophyte results delayed (see presentation S. Birk on macrophyte progress) River GIGs – Central-Baltic

  5. No update since previous version Current plans: finalisation phytobenthos, macrophytes, macroinvertebrates mid 2009 Is this still applicable?? See presentation L. Cerovska on EC GIG progress River GIGs – Eastern Continental

  6. No update since previous version See presentation T. Ferreira on Med GIG progress River GIGs – Mediterranean

  7. No update since previous version Focus on acidification for QE macroinvertebrates Work in progress? River GIGs – Northern

  8. No update since previous version Planned finalisation – end 2009 See presentation D. Pont River GIGs – Fish (all GIGs

  9. Two major horizontal issues identified in the river GIG work plans: Reference conditions Large rivers Presentation R. Owen on progress Propose to add separate planning sheets for these topics in the work programme River GIGs – Horizontal issues

  10. Macrophytes, phytoplankton – no update Benthic fauna – update September 2008 Lakes GIGs – Alpine

  11. No update since previous version Lakes GIGs – Eastern Continental

  12. No update since previous version Lakes GIGs – Mediterranean

  13. Last update September 2008 (phytoplankton, macrophytes, benthic fauna) Lakes GIGs – Central-Baltic

  14. Benthic fauna - last update September 2008 Lakes GIGs – Northern

  15. Plans last updated by Dave Jowett, May 2008 Phytoplankton: results 2011 Benthic invertebrates: results 2010 Macroalgae: results 2010 Angiosperms: results 2011 Fish: results 2010 C/T GIGs – NEA

  16. Plans last updated by G. Casazza, September 2008 Timetables are still missing See presentation G. Casazza on Med progress C/T GIGs – Mediterranean

  17. No update since previous version Timetables are still missing C/T GIGs – Black Sea

  18. Last update September 2008 (H. Karup) Work in progress – draft work plan July 2008 See presentation H. Karup on Baltic progress C/T GIGs – Baltic Sea

  19. Keep IC work programme 2008-11 updated (‘living document’) GIGs are requested to check and update their planning sheets where needed Estimated date of completion should always be included JRC will continuously update the document, with the latest version always available on EEWAI CIRCA Proposed way forward