1 / 7

Interagency Portfolio & Systems Analysis Division

Interagency Portfolio & Systems Analysis Division. NAS-WIDE Simulation Workshop December 10, 2008. Yuri Gawdiak. JPDO External Requirements Drivers from OMB.

carsyn
Download Presentation

Interagency Portfolio & Systems Analysis Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interagency Portfolio & Systems Analysis Division NAS-WIDE Simulation Workshop December 10, 2008 Yuri Gawdiak

  2. JPDO External Requirements Drivers from OMB • Improving NextGen cost and benefit estimation ability, including the ability to quantify the benefits and performance of various levels of investment. The JPDO should work with the NextGen agencies to develop a more systematic, independently-verified methodology for validating the cost of NextGen investments. • Developing an analysis of alternatives for the NextGen Exh. 300 that captures benefit-cost ratios and returns on investment, to be submitted in time for agencies’ FY 2010 budget request to OMB in September 2008. The NextGen Exh. 300 also needs to have a designated, qualified project manager.

  3. Stakeholder Benefit Metrics Matrix Stakeholders

  4. Infrastructure Standards, Communication Capabilities, & Cross Cutting Services Provide Effective Information Sharing Environment The ability to improve information required by aviation regulation, situational awareness and enhance decision making by managing, integrating, and flexibly delivering, relevant and reliable data and information (e.g., advisories, signals, and alerts) on demand in a format that is accessible, secure, and available to authorized users in a unified and coordinated environment. Internal NextGen Requirements Capabilities Cost/Benefit Mapping Tactical, National ,Virtual Real-Time Collaboration & Planning Provide Collaborative Flow Contingency Management Strategic Global Collaboration & Planning The ability to provide optimal, synchronized, and safe strategic flow initiatives and minimized operational impacts in collaboration with enterprise stakeholders, through real or near real time resolutions informed by probabilistic decision making that address large demand/capacity imbalances within capacity management plans. Provide Collaborative Capacity Management Real-time Robotic automation & Safety Assurance The ability to dynamically balance forecasted airspace and airport demand and utilization in collaboration with enterprise stakeholders through proactive strategic planning and automation (e.g. decision support systems), using airspace and airport design requirements, standards and configuration conditions, and with consideration of other air transportation system resources. Provide Flexible Separation Management Provide Efficient Trajectory Management The ability to establish and maintain safe separation minima from other aircraft, vehicles, protected airspace, terrain, weather, etc., predict conflicts, and identify resolutions (e.g., course, speed, altitude, etc.) in real time to accommodate increasing capacity demands and traffic levels using automation (e.g. decision support systems) while applying reduced separation standards. The ability to provide trajectories that minimize the frequency and complexity of aircraft conflicts within the flow through trajectory negotiation and adjusting individual aircraft trajectory and/or sequence when resource contention requires. Provide Flexible Airport Facility & Surface Operations The ability to reallocate or reconfigure the airport facility and surface assets to maintain an acceptable level of service that will accommodate increasing passenger and cargo demand levels, or changes in operational requirements, through infrastructure development, predictive analyses, automation (e.g. decision support systems), and improvements to technology and procedures. Infrastructure Standards, Safety & Risk Management Capabilities, & Cross Cutting Services Provide Integrated Regulatory & Risk Management The ability to provide appropriate, effective and scalable solutions to mitigate environmental impacts, and safety and security risks in the air transportation system based on proactive risk identification and analysis through improved automation, policies, procedures, and processes using established standards, requirements, and responsibilities.

  5. System Modeling Challenges Complex Terminal & Surface Operations Safety/Security Risk Exposure Productivity/Inefficiencies Policy Dynamics System-wide Technology Effects (Situational Awareness/Data Quality) Collaboration Behaviors Market/Fleet Strategies

  6. Future Scenario Challenges Billions of Runs Millions of Runs Thousands of Runs Hundreds of Runs JPDO Full Lifecycle Evaluations out to 2040

  7. Summary • Ability to isolate benefits of individual capabilities include system-wide infrastructure type benefits • Identify to current system opportunity costs - missed or short falls in collaborations in the NAS • Identification of current productivity levels across all components in the system • Ability to incorporate and measure safety and security benefits and constraints • Ability to incorporate surface, terminal, and metroplex operations into the NAS-wide simulations • Ability to incorporate AOC and Airport business objectives at both the strategic and tactical levels • Assess policy and strategic decision risks of the community to fund, develop, and implement the NextGen R&D and programs • Ability to run sufficient number of simulations to evaluate a portfolio of investment options

More Related