An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XTOD Layout and Diagnostic Systems Facility Advisory Committee Meeting October 12-13, 2004 *This work was performed under the auspices of the U.S. Department of Energy by the University of California, Lawrence Livermore National Laboratory under contract No. W-7405-Eng-48 and by Stanford University, Stanford Linear Accelerator Center under contract No. DE-AC03-76SF00515.

  2. Outline • XTOD Layout • FEL parameters along Beam line • Gas and solid attenuators • Imaging detectors • Commissioning strategy • Conclusions

  3. Diagnostics and Front-End Layout

  4. PPS 1.5 Scope: Front End Enclosure/ Near Experimental Hall 4' Muon shield NEH PPS Flipper Mirror Front End Enclosure Comissioning: Spectrometer, Total Energy Solid Attenuator Slit A 112 m Photon Beam Direct Imager Indirect Imager 83 m Slit B Gas Attenuator 13' Muon shield Fast close valve Electron Beam Electron Dump

  5. Front End Diagnostics Schematic 112 m from end of undulator 83 m from end of undulator Front End Enclosure Near Hall Hutch 1 Calorimeter or spectrometer Gas Attenuator Imaging Systems Slits Slits Solid Attenuator Muon Shield Muon Shield

  6. FEL parameters along Beam line

  7. FEL Parameters at 8.261 KeV

  8. Dose to melt for various materials Melt dose ev/atom Dose in NEH Hutch 1 Z 8 keV 1 keV Beryllium 4 0.58 0.013 0.000 Diamond 6 2.13 0.062 0.002 Aluminum 13 0.20 0.072 0.058 Silicon 14 0.91 0.100 0.078 Copper 29 0.44 0.183 0.142 Molybdenum 42 1.24 0.993 0.649 Tin 50 0.14 1.873 1.292 Tungsten 74 1.06 1.316 1.341 Lead 82 0.14 2.016 2.042 Doses should be compared to dose needed to melt

  9. FEL Parameters at 4.000 KeV

  10. FEL Parameters at 0.826 KeV

  11. Material suitability a strong function of photon energy Low Z materials such as Be, C, B4C and Si will survive at least > 1 shot in the NEH NEH Peak Fluence at entrance Fluence to Melt Melts in NEH

  12. Gas and Solid Attenuators

  13. Gas and Solid Attenuators Gas Attenuator stage 2 Gas Attenuator stage 1 Gas Attenuator high pressure vesssel Slit B Autocad Solid Attenuator

  14. Solid Be likely to survive at 88 m Be < 0.1 eV/atom for all photon energies

  15. Pressure or thickness for 10-4 attenuation Use Gas Use Solids * 6 m of gas at pressure

  16. Gas Attenuator Differential Pumping Configurations

  17. Conductance – Intermediate Flow Modeled Knudsen Theory Tube Air 300 K d mm Fg gas factor (air Fg = 1) Molecualr Flow Conductance Intermediate Flow Conductance

  18. Calculations for 6-Port configuration Gas flow to chamber 37.7 T-L/sec 2976 sccm Pump Speed 6 x 50 L/s Inter-connection Coupling L = 3 cm Hole size = 3 mm dia. 6-port configuration can maintain 10 Torr with 3 mm apertures

  19. Bellows allow transverse positioning of opening in window Y stage Gate valve Bellows Be disk on gate valve X stage Y motion Be disk on gate valve transparent to high energy spontaneous, allows alignment of hole using cameras in NEH Hutch 1. Gate valve removes window when gas attenuator not in use.

  20. Conductance – Intermediate Flow Modeled + Gas Attenuator Prototype Design and Analyses Will Validate Concepts

  21. Gas attenuator issues • Pressure / Flow still very high (3 l/min) • Choice of gas • N2 ,Ar , Dry Air,CH-N… • Recirculation / Dumping gas • Normal operation • Unexpected release • Monitoring • Cu L monitor under study

  22. Imaging Systems

  23. NEH Hutch 1 Diagnostic systems Direct Imager Indirect Imager Comissioning Tank

  24. Imaging Detector Tank Be Isolation valve Indirect Imager (Sees only a low intensity reflection) Direct Imager (Placed directly in beam) Turbo pump

  25. Imaging detector head prototype CCD Camera Microscope Objective X-ray beam LSO or YAG:Ce crystal prism assembly

  26. Direct imager issues • Vacuum Operation • Low Photon Energy Performance • 120 Hz Readout • Afterglow in LSO • High Energy Spontaneous Background • Damage threshold

  27. Indirect Imager reflects small amount of FEL into camera, avoiding damage Be Mirror Reflectivity at 8 KeV Be Mirror 1 0.1 0.01 0.001 Be Mirror angle provides "gain" adjustment over several orders of magnitude and discriminates against high energy spontaneous background 0.0001

  28. Minimum mirror reflectivity needed to fill CCD well

  29. Indirect imager issues • Calibration • Mirror roughness • Tight camera geometry • Compton background • Vacuum q-2q mechanics • Making mirror thin enough for maximum transmission • Ceramic multilayers? • Use as an Imaging Monochrometer

  30. Commissioning strategy • Start with Low Power Spontaneous • Saturate Direct Imagers, measure linearity with solid attenuators • Raise power, Measure linearity of Calorimeter and Indirect imager. Cross calibrate • Test Gas Attenuator • Raise Power, Look for FEL • in Direct Imager • Verify linearity with attenuators • switch to Indirect Imager if/when scintilator damages

  31. Summary • Layout geometry is set. • Placement of Gas and solid attenuators enhances survivability of solids relaxing gas attenuator requirements. • Imaging detector concepts based on existing prototypes. Ready for detailed specification of scintillator, objective, … • Commissioning strategy is to bootstrap detectors / attenuators to higher fluences, checking linearity along the way.