JRA1 progress. PSC07 Meeting, Ž abljak, 2 2- 2 3 Januar y 2010. Deliverables. Three JRA1 deliverables produced DJRA1.1 - Grid application requirements and commonalities assessment M06, 7 PM, UoB-RCUB , Editor: B.M. DJRA1.2 - Application-specific monitoring and control tools design
E N D
JRA1 progress PSC07 Meeting, Žabljak, 22-23 January 2010 The SEE-GRID-SCI initiative is co-funded by the European Commission under the FP7 Research Infrastructures contract no. 211338
Deliverables Three JRA1 deliverables produced DJRA1.1 - Grid application requirements and commonalities assessment M06, 7 PM, UoB-RCUB, Editor: B.M. DJRA1.2 - Application-specific monitoring and control tools design M08, 12 PM, IPP, Editor: E.A. DJRA1.3 - Application services design report M12, 10 PM, UoB-RCUB, Editor: B.M. DJRA1.4 - Application services implementation and deployment report M22, 30 PM, UoB-RCUB, Editor: B.M. DJRA1.5 - Assessment of operational tools developed M23, JRA1 28,5 PM, ICI, Editor: A.S. SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 2
Milestones MJRA1.1 - Baseline analysis of operational tools M03, IPP: wiki, informal report MJRA1.2 - Application commonalities assessed and areas of development identified M06, UoB-RCUB: DJRA1.1 MJRA1.3 - Operational tools implemented and running M16, IPP: wiki, informal report 5 in production, Logwatch-G and AMS in beta MJRA1.4 - Selected application services implemented and deployed M24 Demonstration at review SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 3
Ongoing Developments and Metrics (PSC06 -> PSC07) 11 AS (7 major, 3 pre-existing as prototypes, 1 small effort with some initial interest) Described in DJRA1.1, DJRA1.3 and DJRA1.4 7 OT Described in DJRA1.2 and DJRA1.5 Black: As in DoW Green: Achieved SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 4
Application Services(PSC06 -> PSC07) SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 5
Operational Tools(PSC06 -> PSC07) SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 6
Status (OT + AS) SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 7
Internal JRA1 MetricsMeasure and compare the progress of AS & OT Current status (only one of offered values, maximum is 8 points): 1 - Planning - Conceptual description, possibly with initial functional specification, or architectural description 3 - Development - in progress, no working version available 5 - Alpha - working version exists, available only to developers 6 - Beta - working version exists, available to users 7 - Production/live - released, open to adding new features and bug-fixes 8 - Production/stable - released, developers still work on bug-fixes but it is closed for new features 7 - Production/closed - final version released, development closed NaN - Abandoned/Inactive - project abandoned before being released to production Usage (additive for each named usage, up to 6 points): 2 – per each application currently using an application service (AS only) 1 - per each site having tool deployed (if applicable, OT only) or 1 - per each user (e.g. grid site administrator) using it in last 3 months (for OT only) Presentation (only one of offered values, maximum is 6 points): 0 - No presentation or outdated presentation 2 - Up-to-date brief presentation (based on JRA1 presentation template) available (not more than 3 months old) 4 - Up-to-date detailed presentation available (not more than 3 months old) 6 - Detailed presentation available with usage or performance analysis and live or recorded demo Publications (additive 0.5 for each, up to 6 points) Visibility towards wider community (additive for each fulfilled indicator, but up to maximally 8 points) 1 - Software license defined and declared 1 - Introductory web site or Wiki with basic data and functional overview 2 - Architectural description available, online or within the corresponding JRA1-related project deliverable 2 – User documentation available (preferably online) fully covering typical usage, including deployment, if applicable 1 - Source code available publicly or to all eligible users (in accordance with license), e.g. via download. 1 - Source code repository with version control available publicly or to eligible users SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 8
Visibility towards wider community SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 9
JRA Metrics Reporting Did not respond by the start of PSC06 BBmSAMeX (Mihajlo) JTS (Emanouil/Dimitar) Logwatch-G (Valentin) NMTT (Alex) RAS (Davor/Mirsad) AWT added in an AP Expected to provide an overview report at PSC07! JRA1 Wiki has been greatly improved – also visible in metrics 51 edit since PSC06 JTS was late in reporting for PSC07 (again) 50 conference and publication references reported In 2 cases there is a slight regression due to outdated presentations SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 10
Access to JRA1 Developments http://wiki.egee-see.org/index.php/JRA1_Commonalities Significant progress since PSC06: 51 edits Missing summary BBmSAMeX JTS NMTT ESIP-P MEWS Issues persist Missing summaries Resource links Missing publications Collaborations (applications etc.) SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 12
Per-application conclussions In good standing AMS, DM-Web, Event Logger, FM-J-API, Work Binder, CWRE, USGIME, GSSVA, SDSAS, BBmSAMeX, ESIP Platform, Logwatch-G, JTS Need to improve metrics RAS, MEWS, NMTT, AWT, ULMON Need to improve usage AMS, USGIME Need to improve presentation (PPT and Web/Wiki) Event Logger, FM-J-API, Work Binder, SDSAS, ESIP Platform, Logwatch-G OK, but should improve visibility towards wider community GSSVA, JTS SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 14
Dissemination and Plans EGEE UF5 JRA1 umbrella presentation at EGEE UF5 in Uppsala, Sweden, April 12-15 by Anastas Mišev Possible external verification: should advertise our software and collaborate with other related projects and user communities Information exchange (and possible collaboration) with Grid Observatory – more details at EGEE UF5 Work Binder and ESIP-P made submissions to RESPECT program Focus on (unchanged bullets!) Improvement of existing documentation, installation and user documentation Making both code and packaged (installable) software available Start promotion of developments when they reach adequate level of maturity SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 18
Source code availability and repository usage Source and download 11 Source only 2 Download 2 In metrics, 9 confirmed usage of a repository No source or download links for BBmSAM, JTS, RAS Should provide at least source code, if OK with licensing EGEE-SEE/SEE-GRID-SCI SVN-Trac Repository is available, anonymous R/O access also works Download of binaries is a nice commodity SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 23
Ongoing issues Final push for usage by applications AMS - NMTT? BBmSAM – applications? Alignment with application commitments Usage of sites/admins od OTs E.g.Logwatch-G looks rather handy, Valentin is a bit shy in promotion Missing user documentation RAS, GSSVA, AWT, JTS AWT still alpha! Address reviewer OT recommendations in DJRA1.5 (there is also an analogy for AS in DJRA1.4) SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 24
Actions to be Taken One slide each AS/OT for EGEE UF Contributions to DJRA1.5 Wiki, wiki wiki DJRA1.4 helped AS DJRA1.5 for OT User documentation (4 missing) At least basic installation instructions, as done for RESPECT Make at least source code available Final metrics report at M24 SEE-GRID-SCI PSC07 Meeting, Žabljak, 22-23 January 2010 25