1 / 7

Tracking Group Overview

Tracking Group Overview. Bruce Schumm SLAC Linear Collider Workshop January 7-10 2004. Development 1: Funding. LCRD/UCLC Proposal Status Proposal reviewed; components ranked Sept 2002 DOE (LCRD) top-ranked proposals funded as supplements to existing grants

cathal
Download Presentation

Tracking Group Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tracking Group Overview Bruce Schumm SLAC Linear Collider Workshop January 7-10 2004

  2. Development 1: Funding • LCRD/UCLC Proposal Status • Proposal reviewed; components ranked Sept 2002 • DOE (LCRD) top-ranked proposals funded as supplements to existing grants • UCLC re-reviewed as individual proposals; did not fare well • Funded tracking groups: • Sci-Fi Int. Tracker (Indiana/Notre Dame) • GEM Forward Tracking (Louisiana Tech)

  3. SiLC: Silicon tracking For the Linear Collider PRC MeetingDESY, Hamburg, October 31, 2003 Aurore Savoy-Navarro, LPNHE-Universités de Paris 6&7/IN2P3-CNRS, France on behalf of the SiLC Collaboration SilC: an International R&D Collaboration to develop Si-tracking technologies for the LC

  4. Helsinki Obninsk Karlsruhe Paris Prague Wien Geneve Torino Pisa Rome Barcelona Valencia The SiLC Collaboration Brookhaven Ann Arbor Wayne Santa Cruz USA Europe Korean Universities Seoul &Taegu Tokyo ASIA So far: 18 Institutes gathering over 90 people from Asia, Europe & USA Most of these teams are and/or have been collaborating.

  5. Main general focus of interest in each Institute (From Aurore S.-N.)

  6. LCRD/UCLC Funding (Check in with Jim Brau) Any new developments (R&D timelines, white papers, anything else?)

  7. Group-Wide Activity • Between Santa Cruz (6/02) and Arlington (1/03), we had a series of three phone meetings (gaseous tracking, solid-state tracking, and simulation). • Do we want to replicate this in Oct/Nov? • Is there some other model or mode of coordination that we want to consider?

More Related