An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CEMSISFIKS-CT-2000-00109 Cost-Effective Modernisation of Systems Important to Safety Deryk Pavey, wp6_beg022_v0_4_intro slides.ppt

  2. CEMSIS Objectives • Programmable Instrumentation and Control (I&C) • safety systems (e.g. protection) • safety-related systems (e.g. control, data presentation) • Common approach to development and safety justification • maximise safety • minimise cost • Modernisation/Refurbishment • analogue/discrete logic replacement with computer-based systems wp6_beg022_v0_4_intro slides.ppt

  3. ‘Stakeholders’ in CEMSIS • Nuclear Plant Operator • British Energy (co-ord.) UK electricity generation • Electricite de France F electricity generation • British Nuclear Fuels UK nuclear fuel processing • Suppliers & System Integrators • Framatome ANP DE I&C supplier • Sycon International SE system developer • Safety Authorities & Assessors • AV Nuclear B inspection and licensing • Adelard UK safety consultancy • SKI (Sycon subcontract) SE inspection and licensing • IT Research • TU Lund SE research & education wp6_beg022_v0_4_intro slides.ppt

  4. Key Issues • Harmonisation & Structuring of Safety Justification approaches • Definition of Requirements for Systems Important to Safety • Use of Pre-Existing Software in Systems Important to Safety • potentially including class A systems • Use of Languages and Tools in Systems Important to Safety wp6_beg022_v0_4_intro slides.ppt

  5. 4 2 4 4 4 2 1 4 3 2 1 4 4 3 2 4 CEMSIS Modernisation Context User requirements process Acceptance & Phased Introduction Project viability Normal operation and maintenance Utility Requirements document Safety Justification Plan Safety Justification Pre-qualification (independent assessor) Installation & Site Commissioning Tendering process Negotiation & Acceptance SIS requirements specification Validation SW Development Supplier SIS Implementation Decomposition & Design Amended SIS requirements Test and Verification Approval Discuss/ Agree Final Licensing / Approval Regulator Regular communication and informed comment Key: = Work Package Number wp6_beg022_v0_4_intro slides.ppt

  6. Safety Justification Survey and Framework Safety Justification Framework WP1 Requirements Capture Survey and Lifecycle Requirements Capture Guidelines WP2 Case Studies: UK: fuel reprocessing F: PWR I&C replacement SE: safety monitoring + Public Domain Example WP5 Pre-Existing S/W Strategy & Techniques Pre-Existing S/W Guidelines WP3 Languages & Tools Review and Evaluate Languages & Tools Report WP4 WP0,6 Management and Dissemination Work Package Tasks wp6_beg022_v0_4_intro slides.ppt