St. Bernard Port, Harbor & Terminal District. Southern Louisiana Regional Portfields Pilot. Louisiana’s Intermodal Business Complex. Hurricane Katrina: Damage. Hurricane Katrina: Damage. Hurricane Katrina: Damage. Tonnage Growth at the Port of St. Bernard. ‘01. ‘97. ‘05. ‘03. ‘98. ‘04.

celina
Download Presentation

St. Bernard Port, Harbor & Terminal District

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. St. Bernard Port, Harbor & Terminal District Southern Louisiana RegionalPortfields Pilot Louisiana’s Intermodal Business Complex

  2. Hurricane Katrina: Damage

  3. Hurricane Katrina: Damage

  4. Hurricane Katrina: Damage

  5. Tonnage Growth at the Port of St. Bernard ‘01 ‘97 ‘05 ‘03 ‘98 ‘04 ‘00 ‘99 ‘96 ‘02 ‘95

  6. Southern Louisiana RegionalPortfields Pilot • Stormwater System Rehabilitation • Sewerage Improvements to Chalmette and Arabi Intermodal Business Parks • Port Facilities Improvements

  7. Stormwater System Rehabilitation • Project Description – 216 Acre Intermodal Business Park has its own stormwater collection system including a 10-acre Retention Pond that needs to be dredged. • Overview of the project – 10-acre pond needs to be dredged in order to increase stormwater capacity in canals, retention pond and stormwater pumping system. Pond is over 50 years old. • Key milestones and dates – Project being reviewed. Distribution system all are in need of rehabilitation. • Project budget – Estimated $ 750,000.00 • Existing partners – Port Authority • Desired Outcome – Improve stormwater flow and capacity. Enhance water quality of stormwater entering the Mississippi River. Prevent flooding of 216-acre facility. • Current Status – Planning & Pending Funding • Key Challenges/Needs to Achieving Desired Outcome – • Funding and Technical expertise • Disposal of dredge material • Longer-Term Remedies/Actions – • Funding for O & M

  8. Stormwater System Rehabilitation Drainage Canals

  9. Stormwater System Rehabilitation Retention Pond

  10. Sewerage Improvements to Chalmette and Arabi Intermodal Business Parks • Project Description – Connect Sewer Collection system to the local municipal sewer collection treatment system. • Overview of the project –Chalmette location has its own system that is in poor condition due to age. Arabi site has no system. • Key milestones and dates – Sewer improvements would enhance ability to attract new business and create jobs. • Project budget – Estimated $500,000 at each location • Existing partners – St. Bernard Parish Government • Desired Outcome – Utilize port field program to connect sewerage system to municipal system, which will enhance the environment and provide economic development opportunities. • Current Status – Planning • Key Challenges/Needs to Achieving Desired Outcome – • Funding • Project design • Longer-Term Remedies/Actions – Funding for O & M

  11. Sewerage Improvements to Chalmette and Arabi Intermodal Business Parks Sewer Lift Station

  12. Port Facilities Improvement Projects • Project Description – Reconstruct Berths A and F. • Overview of the project – Reconstruct Berths A and F - 100 year old docks are not in use and on verge of collapse. • Key milestones and dates – over $20 million spent on adjacent docks since 1998. • Project budget – Estimated to be $10 million. Budget to be determined based on engineering studies. • Existing partners – Associated Terminals of St. Bernard and Port Authority • Desired Outcome – 1) Increase deep draft Port facilities; 2)Job creation via increase in the number of vessel calls; 3) Sustain and increase cargo volume; 4) Business Retention. • Current Status – Seeking funding • Key Challenges/Needs to Achieving Desired Outcome – • Cost and Funding • Project design • Short-Term Remedies/Actions – Funding • Longer-Term Remedies/Actions – Funding for O & M

  13. Port Facilities Improvement Projects Dock 1, Section A

  14. Port Facilities Improvement Projects Dock 1, Section A

  15. Port Facilities Improvement Projects Dock 1, Section F

  16. Port Facilities Improvement Projects Dock 1, Section F

  17. Thank You