WG FBA Status ReportJerzy DudzikIG Meeting, 11th September 2007
Content • Y/M calculation test • Farther steps
Y/M test calculation • Each TSO hasprepared the worst case for each of its own BC for the year 2007 and for the month April. It referred mainly to the topology changes and units availability. Additionally for transparency purpose, it was required to deliver a short description of the individual worst case, including contingency element. • TBC, FRM, BFRM, BFL and PTDF valueshave been calculated separately for each case by individual TSO • Results: 44 sets of technical parameters for Y capacity allocation and 45 for M capacity allocation
Further steps • Draft of Y/M Test Report covering all results and proposed conclusions will be prepared by the end of September. • During the next WG FBA meeting (first week of October), it is planned: - to approve the Y/M Test Report - to discuss the consultant remarks to the present Concept - to discuss the eventual Concept modification.