WG FBA future activities Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 30 January 2008

WG FBA future activities Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 30 January 2008. Presentation outline. State of the Concept Short term to-do list Mid term to-do list. State of the Concept (1). HLM decisions MF chosen over BC.

randi
Download Presentation

WG FBA future activities Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 30 January 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG FBA future activitiesDr.Uroš Gabrijel (ELES)IG Meeting, Vienna, 30 January 2008

  2. Presentation outline • State of the Concept • Short term to-do list • Mid term to-do list

  3. State of the Concept (1) • HLM decisions • MF chosen over BC. • Centralized preparation of CGM and calculation (condition) • Existing German-Austrian market structure taken into account • Prolongation of the co-operation with consultants • Draft Concept of technical parameters calculation for FBCA • Key components • Flow-Based methodology (MF) - seems perfect in theory. • Technical parameters (CGM, BFRM, FRM, PTDF…) – crucial for efficiency/feasibility

  4. State of the Concept (2) • FBCA is a complex process • Aiming to mimic real power system behaviour -> power flows • Stretched across multiple interdependent time frames. • Additional risks are introduced if not running in closed environment – Kirchoff’s laws are not in line with Regional framework – assumptions needed • Focus on the Concept(HLM decision) • Feasibility and efficiency test of the Concept • Reliability margins and interregional influences evaluation • Curtailment principle to be developed and analyzed

  5. Short term to-do list (1) • Feasibility and efficiency test of the Concept * • FBCA using MF method • New tools required - prototype developed by consultant • Two phases (preparatory, main) • All time frames (Y, M, D), est. 56 calculations • Many open questions regarding technical parameters need to be addressed - Concept improvements • Workshop, meetings, concluding the work by end of May 2008 * Consultant support

  6. Short term to-do list (2) • Reliability margins and interregional influences evaluation * • RM are indispensable – need thorough quantification • Probabilistic approach to external flows assessment • Influences of historical exchanges evaluated with PTDFs • Use of historical exchanges with specific load-flow models • Approach to inter-regional RM harmonization • Technical parameters determination • Discussions, additional meeting, concluding the work by end of June 2008 • Curtailment principle need to be developed and analyzed * - (scope in preparation) * Consultant support

  7. Mid term to-do list • External Dry-run with traders * • Educational purposes – introducing FBCA nature • Earliest possible time-frame - mid June 2008 • Updating the Concept * • Formalisation of procedures • Updating process chains • Real-time congestion reliving principles need to be developed and analyzed * * Envisaged Consultant support

  8. Thank you for your attention!