60 likes | 271 Views
ENTSO-E Network Codes Development Plan. GCRP/JGCRP Belfast 20 th February 2013. Background. ENTSO-E Network Code provisions will have to be translated into EirGrid and SONI Grid Codes The Requirements for Generators ( RfG ) code is the most advanced
E N D
ENTSO-E Network CodesDevelopment Plan GCRP/JGCRP Belfast 20th February 2013
Background • ENTSO-E Network Code provisions will have to be translated into EirGrid and SONI Grid Codes • The Requirements for Generators (RfG) code is the most advanced • RfG expected to go forward for Committee deliberation / approval later this year • TSOs will have three years following approval to ensure Grid Codes are consistent with RfG and other Network Codes
Impact on EirGrid/SONI Grid Codes • The ENTSO-E codes may end up replacing or superseding large portions of the existing Grid Codes (80-90%?) • ENTSO-E SDC want change processes to be developed and trialled for RfG and then used for other codes – assume RfG is final • EirGrid/SONI to explore best way to proceed • RAs keen to see progress in this area
Overview of Current & Future Network Codes Introduction to Network Codes December 2012
Other Considerations • Alignment of Definitions in NCs vs current GCs • Single Document vs Multiple Documents? • Retrospection – EirGrid Grid Code – changes apply retrospectively – not the case for NCs • Shared parts of the EirGrid / SONI Grid Codes? • JGCRP member views?