Network Codes Update. GCRP # 34- February 2013. EirGrid 21 st February 2013 , Belfast. Network Code Overview and Status February 2013.
E N D
Network Codes Update GCRP #34- February 2013 EirGrid 21stFebruary 2013, Belfast
Network Code Overview and Status February 2013 The third legislative package for the internal energy market (Third Package), calls for ENTSO-E to undertake the drafting of network codes on the basis of framework guidelines adopted by ACER.
Status update, as per February 2013 Orange = Submitted to ACER or ACER’s reasoned opinion has been received Black = NC out for consultation or consultation closed Grey = NC Drafting work Purple= Scoping or Final FWG being Developed, formal letter is expected.
JCRPLatest information on Network Codes Status is available on the ENTSO-E website. EirGrid 21stFebruary 2013, Belfast