1 / 5

Liaison Report from 802.18

Liaison Report from 802.18. Date: March 21, 2012.

chaka
Download Presentation

Liaison Report from 802.18

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liaison Report from 802.18 Date:March 21, 2012 Notice:This document has been prepared to assist IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, Notor Research

  2. This document summarizes the activities of the IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) during the IEEE 802 March 2013 Plenary Meeting at Caribe Royale, Orlando, FL. Overview John Notor, Notor Research

  3. FCC Documents Reviewed and Approved by the RR-TAG • There were no documents approved for submission to the FCC at this meeting. • The RR-TAG expects to finalize and approve comments to the FCC 5 GHz U-NII Band Rules Revision NRPM at a teleconference meeting to be held on on Friday April 19th, at 1:00 PM ET. • Link to NPRM: 18-13/016r0 John Notor, Notor Research

  4. ITU-R Documents from 802.16 and 802.11 REG SC Reviewed and Approved by the RR-TAG • The RR-TAG approved the following documents from 802.16 for EC review and submission to ITU-R WP 5D: • 18-13/034r1, Proposed LS to ITU-R WP 5D: Update toward Rec. ITU-R M.1457-12 (Meeting X Notification) Link: 18-13/034r1 • 18-13/035r1, Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) Link: 18-13/035r2 • The RR-TAG approved the following document from the 802.11 Regulatory Standing Committee for EC review and submission as an IEEE 802 document to ITU-R WP 5A: • 18-13/038r3, IEEE 802 Input to WP5A on 5 GHz Link: 18-13/038r3 John Notor, Notor Research

  5. Other Documents Reviewed and Approved by the RR-TAG • The RR-TAG approved the following document from 802.16 for EC review and submission to IETF, copy to the FCC: • 18-13/036r0, Proposed Statement to IETF LMAP on IEEE P802.16.3 Activity Link: 18-13/036r0 • The RR-TAG approved the following document from 802.16 for EC review and submission to the Broadband Forum, copy to the FCC: • 18-13/037r1 Proposed statement to BBF: Response to liaison of 8 March on Performance Measurements Architecture Link: 18-13/037r1 John Notor, Notor Research

More Related