An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oil Spill Cleanup Agent Ani Mukerji Benjamin Russell Claire Dao David Delo Robin Guido Todd Robinson Zhanna Verzi

  2. Table of Contents Project Scope................................................................................................................................................................ 1 Vision Statement (Robin)...................................................................................................................................... 1 Business Need (Robin)......................................................................................................................................... 1 Project Description (Robin)................................................................................................................................... 1 Project Deliverables (Scope) (Robin)................................................................................................................... 2 Project Objectives) (Robin)................................................................................................................................... 3 Assumptions (Claire)............................................................................................................................................. 4 Constraints (Claire................................................................................................................................................. 4 Risks (Ani).............................................................................................................................................................. 5 Stakeholder Analysis (Todd)........................................................................................................................................... 6 Project Lifecycle (Todd)................................................................................................................................................... 7 Work Breakdown Structure (Ben).................................................................................................................................. 8 Project Schedule (Ben)................................................................................................................................................... 9 Communications Plan (Ben)......................................................................................................................................... 10 Responsibility Assignment Matrix (David)...................................................................................................................... 11 Cost Baseline (Zhanna)................................................................................................................................................. 12 Cost Baseline Graph (Zhanna)..................................................................................................................................... 13 Risk Types (Ani)........................................................................................................................................................... 14 Risk Responsibility Chart (Ani)..................................................................................................................................... 15 Risk Assessment Metric (Ani)...................................................................................................................................... 16 Risk Response Plan (Ani)............................................................................................................................................. 17 Seagulls

  3. Project Scope Vision Statement We are looking to ‘change the face’ of the oil industry and improve our image. We want to promote more social responsibility for ourselves and other oil companies. Business Need Positive Environmental impact.Good PR.Cut legal costs and lawsuits.Lower insurance rates.Make money. Project Description Create an ‘green’ product to aid in the clean up of oil spills. Once it has a license, it is used by First Response Team of Noxxe fleet. The licensing of an Noxxe is specifically for use in or on waters. Product incorporated automated deployment mechanism to release chemicals to the water. This product will improve the way we combat oil spills today by providing a more efficient, faster and environmentally safer way to clean oil spills. • 1 gallon of this chemical will clean(absorb) 1000 gallons of oil spill; • product will environmentally safe • is part of fleet emergency kit • is in self-dissolving packaging • it’s projected to produce 2500 gallons of chemical to be acrried by fleet of 50 ships Seagulls

  4. Project Scope Project Deliverables (Scope) Seagulls

  5. Project Scope Project Objectives Seagulls

  6. Project Scope Assumptions Constraints Seagulls

  7. Project Scope Risks Seagulls

  8. Stakeholder Analysis Seagulls

  9. Project Lifecycle Seagulls

  10. Work Breakdown Structure Phase 1 Research 1.1 Historical Case Studies 1.2 Market Research Study 1.3 Patent Research Phase 2 Development 2.1 Modeling 2.2 Prototyping 2.3 Testing Different Prototypes 2.4 Final Prototype Phase 3 Testing 3.1 Functional Testing 3.2 Standards Testing 3.3 Third Party Testing Phase 4 Manufacturing 4.1 Manufacturing Process 4.2 Logistics Phase 5 Launch and Deployment 5.1 Advertising 5.2 PR Seagulls

  11. Project Schedule Seagulls

  12. Responsibility Assignment Matrix Seagulls

  13. Responsibility Assignment Matrix(Continuation) Seagulls

  14. Responsibility Assignment Matrix(Continuation) Seagulls