An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wastewater treatment and land use planning in the village of Kaislastenlahti Lakepromo-seminar 10.-12.10.2007 Eila Pulkkinen/City of Kuopio

  2. Aims of the project • connect rural wastewater treatment to traditional land use planning • promote co-operation between different stakeholders • increase participation of local land owners and inhabitants • create new planning practises

  3. Existing wastewater systems • wastewater systems of the households checked out in 2006 • some renovations needed in 70 % of the systems

  4. The village plan • a draft of the village plan has been approved by the city government: • about 100 new building sites in small groups • in the centre of the village new sites closer to each other and the building sites smaller • new houses in the border of forests, all fields unconstructed

  5. Wastewater treatment • a preliminary checking of the wastewater systems suitable for new building sites • recommendations vary from dry toilets to small treatment plants suitable for groups of houses • renovations of existing houses connected to the systems whenever possible

  6. Recommended systems

  7. Co-operation and participation • teamwork between different experts wasn’t close enough, old ways of working remained • local inhabitants participated very eagerly in the project • a new way of working with inhabitants

  8. Conclusions • most of the objectives were achieved • the way of working with inhabitants will be applied in other areas • the projects of other partners very different and difficult to apply in case Kaislastenlahti • co-operation has been made with the Hungarian partner