UVic Feedthrough Status (electrical)

UVic Feedthrough Status (electrical). Cables at UVic:. Pigtails:. Type received T47 318 + 18 T48 214 + 12 T49 32 T50 16 T51 16 + (10) T52 33 LV 20. Vacuum Cables:.

Download Presentation

UVic Feedthrough Status (electrical)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UVic Feedthrough Status (electrical) Cables at UVic: Pigtails: Type received T47 318 + 18 T48 214 + 12 T49 32 T50 16 T51 16 + (10) T52 33 LV 20 Vacuum Cables: Signal received: 600 (-112) +438 LV received: 40

  2. Cable tests: Visual inspection of all cables Pigtails: a) continuity and cross-wiring b) 64x64 cross talk for calibration cables Vacuum cables: a) high-precision resistance measurement b) ground-contact resistance c) impedance of 6 channels out of 64 d) cross-talk of nearest neighbours e) intermittence of signal traces

  3. Currently Working on Database Entries Pigtails: Continuity and cross-wiring 64x64 cross talk matrix for calibration cables Vacuum Cables: Rmin, Rmaxof all 32 channels of 1 microstrip line (i.e. 4 entries per cable) average Z of each 1 microstrip line (i.e. 2 entries per cable) Contact resistance - average value of each side & number of good contacts out of 13 (i.e. 2x2 entries per cable) Maximum and minimum subtracted cross-talk (i.e. 2 entries per cable)

  4. Electrical Feedthrough Tests at CERN After reception -cross-talk (nearest neighbour for vac. Cables) high precision R time required: 1-2 days/FT Before installation - none During Installation - none After installation - cross talk (nearest neighbour for vac. Cables) high precision R time required: 1-2 days/FT Note: While the cross talk measurements are in progress, no welding can be preformed in the vicinity!