Endcap Feedthrough Production at Victoria

This summary provides an update on the components and assembly status for the production of endcap feedthrough at the University of Victoria. It includes information on pigtail inventory, vacuum cable calibration, and the completion of welding and testing for the first feedthrough.

anieto
Download Presentation

Endcap Feedthrough Production at Victoria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Endcap Feedthrough Production at Victoria Status Summary

  2. Components and Assembly Status for Endcap FeedthroughProduction at the University of Victoria

  3. Pigtail Inventory • T47 - 179 (18 ordered by UVIC) • T48 - 111 (12 ordered by UVIC) • T49 - 32 • T50 - 16 • T51 - 10 (all ordered by UVIC) • LV - 20 (all ordered by UVIC)

  4. Of the first batch of 300 vacuum cables, 32 pairs were identified as being calibration cable candidates Rmax- Rmin < 50 m (only 10 would be required from a batch of 300)

  5. Welding of the first feedthrough (FT0) was completed on 19 July. Cold leak checks and electrical tests were completed on 22 August.

  6. FT0 vacuum cable installation

  7. FT0 before welds

  8. Welding of FT0

  9. Welding of FT0