1 / 17

LGfL Project Report

LGfL Project Report. Proof of Principle of the Shibboleth Authentication & Authorisation Infrastructure (AAI). Session contents. Drivers behind the project Methodology of the project Objectives & deliverables Work packages Participants Production infrastructure Issues to emerge

charis
Download Presentation

LGfL Project Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LGfL Project Report Proof of Principle of the Shibboleth Authentication & Authorisation Infrastructure (AAI) LGfL Project – workshop report

  2. Session contents • Drivers behind the project • Methodology of the project • Objectives & deliverables • Work packages • Participants • Production infrastructure • Issues to emerge • Recommendations to Becta from the project • Key stages for the National Strategy • Becta AAI Federation ... the foundations ... • National strategy ... work packages and service elements ... • Becta AAI Federation ... the structure ... • Becta AAI Federation ... the relationships .... • National Strategy ... Phasing option ... • Post-project developments LGfL Project – workshop report

  3. Drivers behind the project • Existing demand from LEAs and end-users • Educationally desirable for learning • Solution to overcome management issues • Emerging demand from Government • Natural progression from previous projects • Unified sign-on – LGfL • Proof of concept – Leeds / IBIS • Proof of concept worked at a technical level, however • ‘in the lab’ • single vendor only • Needed evidence that concept worked ‘in the wild’ LGfL Project – workshop report

  4. Methodology of the project • Prince 2 approach to project • Formalised project board • Project plan • Project objectives • Project deliverables • Work packages • Staged ‘work in progress’ demos at BETT & NAACE • Quality acceptance plan and tests • External evaluation report LGfL Project – workshop report

  5. Objectives and deliverables • Objectives: • To examine the Shibboleth model in further depth in a ‘real world’ environment • To provide additional evidence of the validity of the Shibboleth model • To identify issues arising out of this further examination • Deliverables: • a working production environment that implements the architecture for the following Shibboleth entities: origin, target and WAYF • public demonstrations of the working of this architecture • two documents that will both evaluate the above environment and identify issues that require addressing in the preparation and implementation phases of a national rollout of an AAA system based upon Shibboleth architecture LGfL Project – workshop report

  6. Work packages • 6 packages addressing: • Production environment infrastructure • Requirements for suppliers of identity and service provider services • Demonstrations at BETT and NAACE • Contractual matters around Escrow and SLAs • Issues of security, interoperability and strategy • External evaluation LGfL Project – workshop report

  7. Participants • Atomwide • Digitalbrain • LGfL • Becta • PenCompass • IBIS • 33 LGfL LEAs + LEAs in 9 other RBCs • Plus contact / research: • Internet2, SWITCH, FEIDE, InCommon, JISC LGfL Project – workshop report

  8. Production infrastructure LGfL Project – workshop report

  9. Issues to emerge • UK school sector only participant at this sector level on the international Shibboleth stage • UK school sector is fundamentally different from HE/FE • Shibboleth-compliant AAI does work in the schools’ market place • Design must be technically resilient and reliable • Trust between all participants is a major key to success • Successful implementation will not occur if left to existing market forces • Insufficient mandate / resources within RBC / LEAs to implement a national solution LGfL Project – workshop report

  10. Recommendations to Becta fromthe project • Adopt Shibboleth as the authentication & authorisation infrastructure for UK schools and LEAs • Adhere strongly to the Internet2 version • Establish a Federation focussed on the schools’ sector • The Federation must be commercially vendor-independent • Becta should directly run or commission the Becta AAI Federation • All participating entities to be compelled to do so through a formalised set of contracts • Participating entity processes and standards should be subject to formal accreditation • All entities must comply with data and child protection principles enforced through the contracts • Adopt the submitted implementation plan and costs for the rollout of a national strategy by Becta LGfL Project – workshop report

  11. Key stages for the National Strategy The following key stages were identified by the project to Becta: • Statement of strategic direction • Creation of the Becta AAI Federation as an entity • Sourcing of sufficient resources to guarantee delivery • Creation of the underlying services • Creation of various legal documents • Establishment of procedures • Recruitment of stakeholders • Entering into contractual agreements by various parties • Ongoing development of the Federation’s services • Interaction with national and international bodies • Provision of the operational aspects of the Federation LGfL Project – workshop report

  12. Becta AAI Federation... the foundations... The project has submitted the following as possible foundations for the Becta AAI Federation: • Implementation plan detailed down to individual tasks • Costed proposal derived from the above implementation plan • Outline work packages for the implementation programme • Federation structures • Contractual schematic • Opportunity to phase from ‘live’ regional Federation to national roll-out LGfL Project – workshop report

  13. National Strategy... work packages & services ... • The work packages are: • Founding the Federation • Setting the Standards • Legal and Contractual • Federation Resourcing • Federation Services • Communications • The service elements covered are: • Infrastructure integration • WAYF service • Attribute Control Authority service • Accreditation service • Support services • Management • Contractual agreements LGfL Project – workshop report

  14. Becta AAI Federation... the structure ... LGfL Project – workshop report

  15. Becta AAI Federation... the relationships ... LGfL Project – workshop report

  16. National Strategy... Phasing option ... LGfL Project – workshop report

  17. Post-projectdevelopments • LGfLaai Federation is operating at a ‘regional’ level • Further major development of the overall process, structures and documentation has taken place • Business processes have been mapped • Management database in operation • On-line, web-based service to be launched which will minimise the potential ‘paper-chase’ / e-mail overload for participating entities LGfL Project – workshop report

More Related