1 / 8

Simplified time accounting for ILUC

Simplified time accounting for ILUC. Michael O’Hare University of California, Berkeley July 2010. Variables. G v = “direct” – variable emissions from one MJ production G c = ILUC – capital investment emissions for one MJ production capacity. Challenge.

Download Presentation

Simplified time accounting for ILUC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simplified time accounting for ILUC Michael O’Hare University of California, Berkeley July 2010 EWG VII-10 O'Hare

  2. Variables • Gv = “direct” – variable emissions from one MJ production • Gc = ILUC – capital investment emissions for one MJ production capacity EWG VII-10 O'Hare

  3. Challenge • Amortizing Gc into a variable cost • requires knowing production period • Ignores atmospheric persistence & cumulative warming • Should include a discount rate • combine Gv and Gc with minimal assumptions to generate a per-MJ GHG intensity EWG VII-10 O'Hare

  4. Kløverpris & Mueller: ILUC accelerates conversion EWG VII-10 O'Hare

  5. Implication of K-M model A single year of biofuel production, if cropland is overall increasing for other reasons, displaces ILUC that would occur anyway to one year earlier. EWG VII-10 O'Hare

  6. Note that: • All discharges in this model occur within a year of each other, so residence time, analytic horizon, etc. don’t matter • There is no avoiding a discount rate, for any action with a time delay component EWG VII-10 O'Hare

  7. If ILUC is land clearing that will occur anyway next year, (annual land clearing > biofuel ILUC) Example: US corn ethanol, Hertel et al Gc Gtotal = 60 + (800 x .05/1.05) = 98 EWG VII-10 O'Hare

  8. Refinements • Production discharges might be discounted half a year (as though occurring in the middle of the year) • Delayed afforestation needs to be handled with a complete time model EWG VII-10 O'Hare

More Related