An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005

  2. NPDgammaExperiment: Precision measurement of parity-violating directional gamma-ray asymmetry A in polarized cold neutron capture on proton. The goal is to measure Awith the accuracy of 10-8. The measurement will unambiguously determine the weak NN coupling constant.

  3. NPDGamma Experiment Setup in FP12 at ER2 FP12 Cave

  4. The NPDg Collaboration

  5. About NPDgammaProject • Scientific proposal was written in 1997 • Management Plan“The n+pD+ Project Management Plan • for Experiment and Beam Line Construction”was signed in 2001. • Sponsors: DoE Nuclear Physics, NSF, NSERC, LANL, • collaborating institutes • Capital cost of the project is roughly $2.5mil + $2.5 mil • Beamline construction project completed 02/04 • Experiment construction project has: • 11 work packages • responsibilities by collaborators and LANL • completed except of the LH2 target work package • project completion forecast 6/03

  6. Status and plans • Status • Beamline completed in 2004 • Experiment completed in 2004 except of the LH2 target • Our goal is to • have the LH2 target ready for beam and for production at the end of March 2006 when beam is assumed to be again available at the Lujan Center after the facility maintenance break. • For this we need to complete • Testing in shed • Install the target on FP12 • Test the target again on FP12 • And pass the reviews

  7. Project’s review history and future • Scientific proposal was written in 1997 • Pendlebury Committee’s physics review in 1997 • Spinka I Committee’ technical review in 1998 • In 1999 the 1st Target Review “Preliminary Conceptual Design Review of the NPDGamma Experiment Hydrogen Target” • Spinka II Committee’s technical review in 2000 • In 2001 the 2nd Target Review “10% design review” set “ a baseline” for further design. • Spinka III technical review in November 2002 • DOE technical progress review on October 2004 • In 2004 the vent line review • In 2005 the 3rd Target Review • Preliminary plan for the DOE closeout review of the construction project agreed to be on August 2006.

  8. Organizational Chart for the NPDGamma Project in Nuclear Physics Program Bill Louis Jack Shlachter Doug Fulton Hersman/UNH Gentile/NIST TBA

  9. Safety Hierarchy in the LH2 Target Project • DOE is involved through the Facility Authorization Basis. • We need to perform USI(=Unreviewed Safety Issue) against the ISAD(=InterimSafety Assessment Document) in addition to the USQs (=unresolved/unreviewed safety questions) that have already been done. • At Lab the highest level signature is coming from LANSCE Division leader; Paul Lisowski. He signs the Authorization Basis, and he is the RDL=responsible Division Leader who signs IWD=Integrated Work Document. • Next level of signature is coming from RGL=responsible Group Leader D. Fulton, P-23) who signs IWD to authorize the work and personnel. • Readiness Review by facility - signed by Alan Hurd, Director of Lujan Center.

  10. IWD • IDW JHA ID 3501 “Testing of the NPDGamma Liquid Hydrogen Target” • Tasks and steps • Hazard analysis • Controls and requirements • Responsibilities - RDL, RGL, Preparer, SMEs, workers • Target personnel - training, authorization process • Target IWD refers to • Lab documents • Engineering Document • Target Operating Procedures • IWD can also give steps for safe performance of a task. If we identify an important task with a higher safety risk we can have a separate IWD for that task.

  11. Value of this review • Independent review of the target by experts • Improves overall target safety • Will create the final design baseline for the target. After this review • drawings • engineering document will be under the change control • The review result will effect on • authorization in different management levels

  12. Flow chart for the shed and ER2 LH2 target effort J. Knudson, chair P. Kelley D. Hill J. Lataille P. Lewis B. Etuk, ….

  13. 30 cm 30 cm Hydrogen Target in Shed • The goal is to review safety of: • as built the LH2 Target cryostat and relief • system. They will be almost same for the shed • and ER2 operation. • as built the gas handling system in shed • a plan for the gas handling system for ER2 • plans for controls and operations

  14. LH2 Target Vessel and Isolation Vacuum