NCHRP Project 17-35 : Evaluation of Safety Strategies at Signalized Intersections

NCHRP Project 17-35 : Evaluation of Safety Strategies at Signalized Intersections. Key Team Members: Raghavan Srinivasan (PI), HSRC Kim Eccles (Co-PI), VHB Persaud and Lyon Inc. Alicia Carriquiry, Iowa State University. Objectives and Scope.

chas
Download Presentation

NCHRP Project 17-35 : Evaluation of Safety Strategies at Signalized Intersections

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCHRP Project 17-35: Evaluation of Safety Strategies at Signalized Intersections Key Team Members: Raghavan Srinivasan (PI), HSRC Kim Eccles (Co-PI), VHB Persaud and Lyon Inc. Alicia Carriquiry, Iowa State University

  2. Objectives and Scope • Complementary to the FHWA Pooled Fund Safety Evaluation project • Develop Accident Modification Factors for selected strategies from Volume 12 of NCHRP Report 500 (strategies at signalized intersections) • Focus on ‘tried’ and ‘experimental’ • Before-after safety effectiveness evaluations • Likely to evaluate 4-5 treatments

  3. Tasks • Task 1: Literature Review • Reviewed ongoing and recently completed studies • Focus on crash based studies • For each study: • Data • Methodology • Develop Accident Modification Factors • Comments and Rating (low, low-medium, medium-high, and high)

  4. Task 2: Survey of Agencies • On-line survey using Zoomerang • Links to the survey: • Part 1: • http://www.zoomerang.com/survey.zgi?p=WEB226KF66HVXX • Part 2: • http://www.zoomerang.com/survey.zgi?p=WEB226KF6HHW6N

  5. Survey of Agencies, contd. • State DOTs • Selected local agencies • Listservs • Traffic Control Devices • Safety Engineers

  6. Future Tasks • Compile results of Task 2 survey • Follow-up with phone calls to selected agencies • Select possible strategies/treatments • Develop work plan and interim report (Aug 2007) • Meet with NCHRP Panel (Sep/Oct 2007) • After Panel’s approval, start compiling data for evaluating the selected treatments • Project is scheduled to end October 31, 2009