MERIS Calibration Results

MERIS Calibration Results. Photo: Courtesy Alcatel Space Industries. Instrument Status. 6 months of successful in-orbit operation, 5 months under full MPS control , N o degradation or changes in telemetry data MERIS overall health is in excellent state. Absolute Geolocation:

chavi
Download Presentation

MERIS Calibration Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MERIS Calibration Results Photo: Courtesy Alcatel Space Industries

  2. Instrument Status • 6 months ofsuccessful in-orbit operation, • 5 months underfull MPS control, • No degradation or changes in telemetry data • MERIS overall health is in excellent state

  3. Absolute Geolocation: • Requirement <2 Km • Measurement +/- 1 RR pixels • Instrument pointing offset is very • well characterized over (U.K. NL) • Pointing Stability is very good over the complete orbit Geo-located Image of Northern Australia Pointing Performance Summary

  4. Instrument Smile Spectrometric performances : Summary • Spectral Sampling interval: • Requirement 1.25 nm +/- 2 % • Measurement 1.25 nm +/- 0.2 % • Spectrometer dispersion is very linear and well within specification • Spectral band position: • Requirement < 1 nm • Measurement < 0.2 nm • Spectrometer in-flight characterization is well within specification

  5. Summary Radiometric Performance: Dark current characteristics • Mission Specifications: • 2% Orbital stability requirement • 0.5 % Orbital stability goal • Measured performance: • Orbital stability: 0.03 % before compensation • Smear band sensitive to SAA • No permanent damage to CCD • Instrument Offset is very stable and well within Specification • Actions needed: • Instrument to be operated in OCL ON

  6. SODAP Phase 6 Summary Radiometric Performance: NEDL / SNR • Mission Specifications: See chart • Measured performance: • All measured SNR are above the mission specifications • All Ocean Color bands are above the mission Goals (except 412nm) • SNR is well within Specification • Actions needed: None

  7. Summary Radiometric Performance: Instrument Stability / Degradation • Instrument Specifications: • 6% Absolute Radiometric accuracy goal • 1 % Absolute radiometric accuracy goal • Measured performance: • Diffusers Comparison • Identical +/- 0.5% • Characterization Accuracy < 0.5% • Model accuracy +/- 0.5% • Diffuser Degradation < 0.2 % • Instrument Degradation • Overall degradation < 2% • Blue bands are degrading slowly => Module 2 @ 412nm degrading fastest • Both Diffusers are nearly identical (BRDF) and very stable • Actions needed: Improve BRDF model based on in-flight data

  8. TOA Radiance from Field measurements • Railroad Valley Playa • TOA Normalised Radiance MERIS – AATSR • Orbit 2136 • TOA Radiances MERIS - SeaWiFS • Barrow (Alaska) 870 nm 3.5 % Complete orbit 4 % over Water 550 nm 5 % Complete orbit 6% over Water 670 nm 1 % Complete orbit 4 % over Water Radiometric Performance: Early Vicarious Calibration Results • All differences are within the limits of the vicarious calibration approachs

  9. Summary Radiometric Accuracy: • Absolute Radiometric accuracy: • Requirement < 6% => 1% Goal • Early Vicarious Calibration +/- 6 % • Diffuser BRDF Characterization accuracy < 1% • Diffuser BRDF model accuracy +/- 0.5% • BRDF model well within Specification => to be improve with in-flight data • Absolute Radiometric accuracy will be estimated using vicarious calibration results • Level 1b Processing Correction: • Non-Linearity will be switched ON, • Straylight correction will be switched ON • Smile correction will be performed in the Level 2 processing • MERIS Level 1b Radiance will be distributed with the instrument smile

  10. MERIS Level1b Algorithms: Summary • Level 1b processing performs as expected • Prototype and IPF are in line • Minor problems identified and solved during the period • No algorithm modification are required

  11. Routine Calibration Activities: Summary • Level 1b is ready to be transfered to operations • Routine Calibration • IECF will be transfered to operation by Mid-November • Continuity of data distribution via IECF-Metric tool • Systematic calibration activity • Cal / Val plan, • Support contract will begin in January 2003 • Quality Working Group will begin in January 2003 • The tools for insuring the product quality are available.

  12. Algal 1 Level 2 Verification: Summary • Initial Level 2 verification is very encouraging • Satisfying results for: • pixel classification • land products • cloud and water vapour products • ocean AC and turbid water identification • algal pigment index 1 • Additional tuning is needed for: • ocean atmospheric correction in all bands • case2 water constituents • surface pressure • water vapour above clouds

  13. Recommendations Level 1b corrections to be applied for Validation: • Non-Linearity • Straylight Smile correction will be applied at Level 2 Level 1b algorithms improvements • Include Smile information in the L1b products Spectral Calibration Campaigns • Repeat spectral campaigns with optimized band settings Diffuser Observations & Modelling • Improve BRDF model with in-flight data

  14. Recommendations (2) Processor Configuration • Post the processor & ADF configuration status Including a detail changes log. Routine Calibration • Include routine comparisons of AATSR – MERIS macro-pixels MERIS & AATSR Toolbox • Include a smile correction: L1b -> L1s