1 / 18

March 20, 2014

Upcoming Improvements in and around Fair Park: - MLK Boulevard Streetscape Improvements - Grand Avenue Complete Street Improvements - JB Jackson Street Reconstruction - Fair Park Improvements, Vision and Strategies - Building Façade Improvements. March 20, 2014.

chaz
Download Presentation

March 20, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Upcoming Improvements in and around Fair Park:- MLK Boulevard Streetscape Improvements - Grand Avenue Complete Street Improvements- JB Jackson Street Reconstruction - Fair Park Improvements, Vision and Strategies - Building Façade Improvements March 20, 2014

  2. Improvements at Atlanta and Malcolm X Intersections include: • Enhanced barrier free ramps and crosswalks • Monuments and benches • Pedestrian lighting • Landscaping • Improvements at Robert B Cullum will be focused on the addition of monuments in the median Project Overview – Phase 1

  3. Improvements on Grand include: • Enhanced Sidewalks and Crosswalks (Atlanta, Malcolm X, JB Jackson, and RB Cullum intersection) • Pedestrian Lighting • Landscaping • Major Drainage Improvement (Mill Creek/Peak Branch relief) • Monument (Malcolm X and Grand Intersection) • Improvements at MLK and Fair Park Entry: • Monuments • Enhanced Sidewalks and Crosswalks ( JB Jackson, and RB Cullum intersections) • Pedestrian Lighting • Landscaping • JB Jackson will be reconstructed per City standards Project Overview – Phase 2

  4. MLK/Grand Business Owner’s Meeting March 20, 2014 Neighborhood Meeting April 2014 Neighborhood Meeting - September 2014 Project Schedule

  5. Estimated Costs Funding Project Budget

  6. Concept Map

  7. MLK @ Atlanta Intersection

  8. Malcolm X Intersection (Type C) MLK @ Malcolm X Intersection

  9. MLK @ DART

  10. Illuminated Monument RB Cullum Median Monument

  11. Grand @ Atlanta Intersection

  12. Grand @ Malcolm X Intersection

  13. Fair Park Entry Concept Details

  14. Fair Park Entry Concept Sketches (Monuments Only)

  15. Dallas Weekly on MLK Blvd • Façade Program for this building includes: • Installed new store front - glass double door / steel encasing in place of single door • Installed new exterior / wall mounted lighting at each window space • Removed exterior window guards and installed inside the building • Installed glass type panels over each window openings • Painted and trimmed entire building

  16. Catfish Smith - Lamar / Hatcher • Façade Program for this building includes: • Installed all new store front windows • Installed neon lighting throughout perimeter of building • Painted wall to wall fish mural along Hatcher and Lamar • Painted and trimmed car port

  17. Fair Park Vision Strategy Priorities; • Priorities and budgets developed with the Mayor’s concurrence: • Marketing $50,000 • Digital and social media • 2. Visitor amenities $628,000 • Full year operation of 14 fountains • Vision Center – feasibility study • Tree and building lights • Bicycle rental station

  18. 3. Programming $524,000 • Programming Consultation and implementation • 4. Promotional strategies $48,000 • Coliseum Improvements – feasibility study • 5. Contingency $160,000 • TOTAL: $1,400,000