An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SR520Urban Partnership Project Jennifer Charlebois, P.E. Tolling and Systems Project Engineer Urban Corridors Office 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle

  2. The Lake Washington Urban Partnership ________________________________________________________________________________________________________________ LAKE WASHINGTON URBAN PARTNERSHIP

  3. The Lake Washington Urban Partnership This partnership is a unique opportunity— • It is tied to the urgent need to replace the SR 520 Lake Washington floating bridge and approaches • It is an ideal corridor to test congestion pricing, transit and technology working in concert. • The legislature is ready to set the state’s tolling policy framework. • The Lake Washington Urban Partnership will clearly demonstrate to Puget Sound residents how the 4 Ts can work together to finance new facilities, and make existing and new infrastructure as productive as possible for our communities. ________________________________________________________________________________________________________________ LAKE WASHINGTON URBAN PARTNERSHIP

  4. The Lake Washington Urban Partnership Designed to reduce congestion through the “Four T’s”: · Transit · Technology · Telecommuting · Tolling Awarded $154.5 million to assist WSDOT, PSRC and King County in applying these innovative approaches to reduce congestion in the 520 corridor.   Other regions that have been selected for Urban Partnership Agreements include: Miami San Francisco Minneapolis Los Angeles Chicago Funded by: LAKE WASHINGTON URBAN PARTNERSHIP

  5. LAKE WASHINGTON URBAN PARTNERSHIP

  6. Telecommuting and TDM in the 520 corridor • The Urban Partnership will build on existing commute trip reduction programs and encourage: • telecommuting and flexible schedules • educational campaigns • employer subsidies • car/vanpooling Current commute trip reduction programs in the 520 corridor LAKE WASHINGTON URBAN PARTNERSHIP

  7. Adding transit to the 520 corridor The 520 corridor today: - 24 bus routes - 400 bus trips a day - 13,400 riders daily • The Urban Partnership Agreement allocates $41 million to be used to: • purchase 45 additional buses for the 520 corridor; • make improvements to the South Kirkland • and downtown Redmond Park and Rides; • enhance passenger facilities (new shelters and • improved lighting); and • install Real Time Information signs. LAKE WASHINGTON URBAN PARTNERSHIP

  8. Electronic tolling in Washington • Drivers would be encouraged to set up prepaid Good to Go! accounts, using the same system used on both the Tacoma Narrows Bridge and the SR 167 HOT Lanes Pilot Project. • Those without Good To Go! accounts would be billed based on their license plate, with a surcharge added to the toll rate. • Washington drivers have easily embraced electronic tolling and signed up in record numbers – more than 90,000 accounts and 200,000 transponders in the first six months – the most successful launch in the country. The 520 corridor Electronic tolling at the Tacoma Narrows Bridge. SR 167 HOT lanes Tacoma Narrows Bridge Simulation of electronic tolling on SR 167 HOT lanes. Current and future tolling options in the Puget Sound region. LAKE WASHINGTON URBAN PARTNERSHIP

  9. Electronic tolling on SR 520 • A single tolling point would be constructed on the existing SR 520 bridge • All tolls on the 520 corridor would be collected electronically – no toll booths. • Toll rates would vary by time of day – drivers would pay less during off-peak travel times. Simulation of electronic tolling on SR 520 Floating Bridge LAKE WASHINGTON URBAN PARTNERSHIP

  10. Technology Improvements • Will expand WSDOT’s intelligent transportation system, that now includes: • 135 ramp meters, real-time traveler information, 475 traffic cameras, 179 electronic message boards, 7 traffic management centers, 55 incident response trucks, 884 timed traffic signals, 200 miles of HOV lanes and 20 miles of HOT lanes. M42 Birmingham, England Overhead gantry envisioned by WSDOT LAKE WASHINGTON URBAN PARTNERSHIP

  11. Technology Improvements New travel times signs will be added to the corridor that will assist drivers in making trip decisions. ________________________________________________________________________________________________________________ LAKE WASHINGTON URBAN PARTNERSHIP

  12. Technology Improvements • Active Traffic Management techniques will be implemented on SR520 and I-90 • Variable Speed limit signs over each lane with message signs alert drivers of backups ahead • Lane Control signs alert drivers to steer away from trouble spots and clear the way for emergency vehicles. ________________________________________________________________________________________________________________ LAKE WASHINGTON URBAN PARTNERSHIP

  13. Implementation Schedule ________________________________________________________________________________________________________________ LAKE WASHINGTON URBAN PARTNERSHIP

  14. Questions? The existing SR 520 Bridge.