PHENIX Timetable. Jan 2001. May 2001. Jan 26 2002. March 2002. June 2002. Sept 2002. FY 2003. FY 2002. Prepare S m. S m with Au-Au beams. p-p. Run N m & S m. 1 st mm physics (J/ suppression & single m ’s). 2-Arm physics. Install N m chambers.
E N D
PHENIX Timetable Jan 2001 May 2001 Jan 26 2002 March 2002 June 2002 Sept 2002 FY 2003 FY 2002 Prepare Sm Sm with Au-Au beams p-p Run Nm & Sm 1stmm physics (J/ suppression & single m’s) 2-Arm physics Install Nm chambers Build Nm chambers Install Nm FEE Start Building Nm FEE Complete Nm FEE Fix Sm Run MVD Prepare MVD (60%) Run MVD Finish MVD 1st MVD physics (dN/dη, vertex & fluctuations) p-p Au-Au Beams Beam Si vertex upgrade R&D for charm physics In FY2003 d-A, p-p and Au-Au collisions are all likely
History of the LANL HENP Program E772 (1987 - …) DY, J/Y, Y’, U Nuclear Dep. Spokesman: Moss NA44 (1990 - …) Bose-Einstein Corrlations,… Jacak, Sullivan,van Hecke E789 (1990 - …) sbb, sJ/Y, D0 Nuclear Dep. Spokesman: Peng SSC (GEM,SLD 1990 - …) GEM Silicon tracker (Brooks, Lee, Palounek) E866/NuSea (1996 - …) , J/Y, Y’, Nuclear Dep. Spokesmen: Garvey,McGaughey,Leitch PHENIX (1990 - …) Muons: J/Y, single-m, open-charm, spin, p-A, QGP MVD: dN/dη, ZVERTEX E906 (2006?) at high-x, parton dE/dz Spokesman: Reimer (ANL)
People & Highlights of Responsibilities • Physicists: • Barnes (1/2 on EDM, return-to-research funding ended last year) : chamber construction, PHENIX physics. • Brooks: m-tracking detector council representative, m-software leader, m-electronics, PHENIX Institutional Board representative. • Garvey(retired) : E866, eRHIC, advisor to BNL management & John Browne, RHIC program supporter but no direct involvement in PHENIX. • Hansen (postdoc) : hadron physics, MVD electronics & software. • Lee : chamber construction manager, silicon-vertex upgrade. • Leitch: HENP team leader , m-electronics, m-calibration system, m-software, J/ suppression, p-A, shadowing, parton energy-loss, E866 spokesman, PHENIX Executive Council • McGaughey : m-electronics, m-calibration system, m-software, parton enegy-loss, silicon-vertexupgrade LDRD spokesman, former E866 spokesman, E906. • Liu (newest staff member) : m-electronics, m-software, online monitoring, spin physics • Mischke(now off the program) : was m-electronics manager & is now expert consultant. • Moss : spin physics, parton energy-loss, silicon-vertex upgrade, APS DNP chair. • Peng (1/4 time on EDM; leaving LANL in Jan) : E866 physics, parton energy-loss, p-A and parton physics at RHIC, PHENIX upgrades, extensive long-range planning work, FNAL/E906, JHF. • Sullivan :MVD PHENIX detector council representative, hadron physics, MVD electronics & software. • Van Hecke :MVD ancillary systems & DAQ, hadron physics • Engineers • Boissevain (1/4) : MVD constuction, m layout engineering. • Sondheim (funded by construction $’s) : PHENIX mlead engineer & system integration