An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS

  2. SASSO FIELDNew Turf Field Installed

  3. Sasso Field Painted buildings & new tent

  4. Sasso Field Lightning Detector

  5. SASSO FIELD • New cameras Installed • Sealed blacktop under bleachers

  6. High School A-gym Floor Refinished

  7. FAIR LAWN HIGH SCHOOL B-WING CAFETERIA ROOF

  8. HIGH SCHOOL • Abated 3 classrooms (Rms B120, B122, B204) • Painted 5 classrooms • Retiled A-wing girls’ bathroom • HS Stage Lighting • HS Lighting (pending) • Auditorium underground conduit, carpeted aisles

  9. Memorial – Completed installation of windows on west side of building

  10. Memorial SchoolPainted lockers on 1st and 2nd floor

  11. MEMORIAL SCHOOL – Trimmed trees back from field

  12. Memorial SchoolTrimmed trees back from steps

  13. MEMORIAL SCHOOL • Installed new energy efficient LED lights in auditorium • Rm 214 – converted from storeroom to classroom instruction • Auditorium – rebuilt exhaust fan • Repaired terrazzo floor outside main office

  14. THOMAS JEFFERSON SCHOOL Repaved & striped front lot Widened exit driveway to allow right & left turns upon exiting

  15. THOMAS JEFFERSON SCHOOL • Painted lockers and installed new lockers on 1st floor • Carpeted 5 offices in Child Study Team room • Boys’ locker bathroom and boys’ room by Rm 119 – installed new floor drains & waterless urinals • Installed wireless clock system • Rm 116 – abated floor and installed VCT tile

  16. EDISON SCHOOL Moved sign from HS and installed at Edison

  17. EDISON SCHOOL • Paving of front lot and re-striping for bus access (pending) • Repaired windows

  18. FORREST SCHOOL • Installed VCT tile in 4 classrooms • Moved KECO from Forrest to Edison School

  19. Lyncrest School Canopy, Ceiling & LED lights

  20. MILNES SCHOOL Refurbished 2 storm drains in rear parking lot and repaved.

  21. INSTALLED CHAIRLIFT AT MILNES SCHOOL

  22. Radburn School Kindergarten Windows Installed new energy efficient thermopane windows

  23. RADBURN SCHOOL • Converted music room to new kindergarten room on ground floor • Installed new security gate on ground floor by new addition lobby • Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals

  24. Warren Point School Installed new digital sign on Broadway

  25. Warren Point SchoolMilled and repaved teacher parking lot and installed new security gates

  26. Warren Point SchoolInstalled 100 cubic yards of mulch on playground

  27. Warren Point SchoolInstalled new Fire Doors in old wing-1st floor

  28. Westmoreland SchoolInstalled energy efficient thermopane windows in gym

  29. WESTMORELAND SCHOOL • Replacement of bathroom partitions (pending)

  30. DISTRICT • Installed security locks in all school buildings • Room numbers stenciled on exterior windows in all school buildings • Purchased maintenance truck • Purchase of leaf vacuum (pending) • Purchase of salt spreader (pending)