FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS
SASSO FIELD • New cameras Installed • Sealed blacktop under bleachers
FAIR LAWN HIGH SCHOOL B-WING CAFETERIA ROOF
HIGH SCHOOL • Abated 3 classrooms (Rms B120, B122, B204) • Painted 5 classrooms • Retiled A-wing girls’ bathroom • HS Stage Lighting • HS Lighting (pending) • Auditorium underground conduit, carpeted aisles
Memorial – Completed installation of windows on west side of building
MEMORIAL SCHOOL • Installed new energy efficient LED lights in auditorium • Rm 214 – converted from storeroom to classroom instruction • Auditorium – rebuilt exhaust fan • Repaired terrazzo floor outside main office
THOMAS JEFFERSON SCHOOL Repaved & striped front lot Widened exit driveway to allow right & left turns upon exiting
THOMAS JEFFERSON SCHOOL • Painted lockers and installed new lockers on 1st floor • Carpeted 5 offices in Child Study Team room • Boys’ locker bathroom and boys’ room by Rm 119 – installed new floor drains & waterless urinals • Installed wireless clock system • Rm 116 – abated floor and installed VCT tile
EDISON SCHOOL Moved sign from HS and installed at Edison
EDISON SCHOOL • Paving of front lot and re-striping for bus access (pending) • Repaired windows
FORREST SCHOOL • Installed VCT tile in 4 classrooms • Moved KECO from Forrest to Edison School
MILNES SCHOOL Refurbished 2 storm drains in rear parking lot and repaved.
INSTALLED CHAIRLIFT AT MILNES SCHOOL
Radburn School Kindergarten Windows Installed new energy efficient thermopane windows
RADBURN SCHOOL • Converted music room to new kindergarten room on ground floor • Installed new security gate on ground floor by new addition lobby • Ground floor boys’ room in stairwell – installed new floor drains and waterless urinals
Warren Point School Installed new digital sign on Broadway
Warren Point SchoolMilled and repaved teacher parking lot and installed new security gates
Warren Point SchoolInstalled 100 cubic yards of mulch on playground
Warren Point SchoolInstalled new Fire Doors in old wing-1st floor
Westmoreland SchoolInstalled energy efficient thermopane windows in gym
WESTMORELAND SCHOOL • Replacement of bathroom partitions (pending)
DISTRICT • Installed security locks in all school buildings • Room numbers stenciled on exterior windows in all school buildings • Purchased maintenance truck • Purchase of leaf vacuum (pending) • Purchase of salt spreader (pending)