1 / 6

FORCAST Commissioning

FORCAST Commissioning. September 29, 2009 Cornell University. Adams/Herter. FORCAST Telescope Configurations. FORCAST Observing Modes. FORCAST Line Ops Tests. FORCAST Commissioning Procedures. EMI/EMC Test MCCS Communications Functional Test INF Pressure Test

chibale
Download Presentation

FORCAST Commissioning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FORCASTCommissioning September 29, 2009 Cornell University Adams/Herter

  2. FORCAST Telescope Configurations FORCAST Trimester Review

  3. FORCAST Observing Modes FORCAST Trimester Review

  4. FORCAST Line Ops Tests FORCAST Trimester Review

  5. FORCAST Commissioning Procedures • EMI/EMC Test • MCCS Communications Functional Test • INF Pressure Test • Alignment and Setup in the Air • Pupil alignment check in the air • Frame rates (depend on background conditions) • Telescope functionality (focus, chop and nod) • Chop and nod settle times • Pointing Stability • System Characterization • Optimum instrument parameters per instrument filter mode (bias, well depth) • Optimum chop frequency • Telescope emissivity • Sensitivity (standard stars) FORCAST Trimester Review

  6. Observing Techniques for Extended Sources (to be Tested During Line Ops) • Standard chop and nod (inefficient) • Quick step-and-stare (less effective sky subtraction) • Scanning (requires fast reads and many scans) FORCAST Trimester Review

More Related