1 / 24

Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop

Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop. Consultant Presentation Iowa DOT 2 nd April 2007. Workshop Goals. Agree on recommended bridge and foundation alternative to be carried forward into preliminary design.

chick
Download Presentation

Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2nd April 2007

  2. Workshop Goals • Agree on recommended bridge and foundation alternative to be carried forward into preliminary design. • Decide if bridge and geotechnical reports will be combined into one final report. • Discuss level of effort anticipated in conducting the pre-final design load testing program for the post-grouted drilled shafts

  3. Information from February 2006 PIM

  4. Overview of Bridge Replacement Options • Update to bridge options and schedules presented in the June 2006 Draft Bridge Report • Three bridge replacement options • Three bridge lengthening alternatives • Drilled shafts as foundations

  5. Bridge Construction Costs

  6. Summary of Options Costs do not include approach slabs, demolition and mobilization.

  7. Option 1: Least Cost

  8. Option 1: Least Cost

  9. Option 2: Shortest Schedule

  10. Option 2: Shortest Schedule

  11. Option 3: Hybrid Concept

  12. Option 3: Hybrid Concept

  13. Lengthening the Bridge • Construction Cost Implications • Soil Remediation and Retaining Wall Implications • Lengthening Options

  14. Lengthening the Bridge

  15. Lengthening the Bridge • Alternate 1 • Extend bridge 37’-6” at east end • Extend bridge 25’-0” at west end • Sloping ground under bridge • MSE walls along sides • Alternate 2 • Extend bridge 100’-0” at east end • Provides 9’-0” min. vertical clearance under bridge • MSE walls in front of abutments • Alternate 3 • Extend bridge 200’-0” at west end • Extend bridge 250’-0” at east end • Provides 2’-0” min. vertical clearance under bridge • Soil remediation significantly reduced • Cantilevered retaining wall likely used for remaining short fill heights

  16. Lengthening the Bridge

  17. Lengthening the Bridge Average Net Cost for Additional Bridge Length = $ 4,600 / ft.

  18. Foundation and Soil Remediation Options • Post-grouted Drilled Shafts • Drilled Shafts Socketed in Bedrock • CMC Ground Improvements at Bridge Approaches • Lightweight Foamed Concrete Fill at Approaches

  19. Drilled Shaft Load Test Program • Expected Schedule • Level of Effort Required from CH2M HILL

  20. Bridge Aesthetics • Piers, Abutments, Retaining Walls • Bridge Railings, Barriers, Beams • Coloring textures, Rustications • Lighting

More Related