An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Miljöfrukost 2 mars 2010 – Marina Gregorsson Jämtlands läns energikontor

  2. Ekodesign • Hembelysning I (Lot 19) • Förordningen trädde i kraft 13 april 2009. • De första kraven träder i kraft 1 september 2009. • Så här ser tidplanen för utfasning ut: • September 2009 Förbud mot alla matta glödlampor + klara 100 watts glödlampor • September 2010 Förbud mot klara 75 watts glödlampor • September 2011 Förbud mot klara 60 watts glödlampor • September 2012 Förbud mot klara 40 och klara 25 watts glödlampor • September 2013 Skärpta krav på lågenergilampor och LED-lampor • September 2016 Skärpta krav på halogenlampor  • Från och med 1 september 2010 måste eventuellt kvicksilverinnehåll anges på lampförpackningen tillsammans med instruktioner om vad man ska göra med trasiga lampor.

  3. Ekodesign Gatu- och kontorsbelysning (Lot 8 och 9) EU-kommissionen antog 24 mars 2009 en ekodesignförordning för gatu-och kontorsbelysning. De första kraven träder i kraft 13 april 2010, och skärps sedan i flera steg.

  4. Tidplan ekodesign 2009 September Hembelysning fas 1 09-09-012010 Januari TV 10-01-07 Januari Standby 10-01-07 Februari Enkla digitalboxar   10-02-25 April Externa nätaggregat   10-04-27 April Gatu- & kontorsbelys.  10-04-13  Juli  Kylfrysar  10-07-01 Augusti TV 10-08-20  September Hembelysning fas 2 10-09-012011 April Ext nätaggregat   11-04-27 April  Gatu- & kontorsbelys.  11-04-13 Juni Motorer 11-06-16 Augusti  TV 11-08-20 September Hembelysning fas 3 11-09-01

  5. …fortsättning tidplan 2012 Februari Enkla digitalboxar   12-02-25 April  TV   12-04-01 September Hembelysning fas 4 12-09-01 2013 Januari Standby 13-01-07 Januari Cirkulationspumpar 13-01-01 Juli  Kylfrysar 13-07-01 September Hembelysning fas 5 13-09-01 2015 Januari Motorer 15-01-01 Augusti Cirkulationspumpar 15-08-01 2016 September Hembelysning fas 6 16-09-01 2017 Januari Motorer 17-01-01

  6. Ekodesigndirektivet ändras Ändringen innebär att energirelaterade produkter kan få ekodesignkrav framöver. Den ska vara införd i den svenska lagen om ekodesign senast den 20 november 2010. Detta innebär att fönster och kranar kan få ekodesignkrav.

  7. Energikartläggnings-checkar Nytt femårigt ekonomiskt stöd. Små och medelstora företag. Energianvändning på minst 500 MWh. 50 % av kostnaden, dock maximalt 30 000 kr. Ansök elektroniskt på Energimyndighetens hemsida.

  8. Ljusare tider på väg och Lördagen den 27 mars 2010 släcker vi för en ljusare värld.

  9. Kl 20.30-21.30 genomförs världens största klimatmanifestation. Visa ditt stöd för klimatet och uppmana samtidigt världens makthavare att agera i klimatfrågan. Delta i Earth Hour – var en del av lösningen.

  10. Be the change you want to see in the world! Marina Gregorsson 063-57 01 03 marina@energikontoret.z.se www.energikontoret.z.se