1 / 12

ADS-C OPA

ADS-C OPA. WG78/SC214 Sub-group meeting 13-17 Feb 12. RSP Specifications. ADS-C OPA: Annex G. Different RSP Specs: ENR-1/TMA/APT 1) ENR-2 2) 1) ENR-1/TMA/APT, Perf Spec labelled as ‘RSP’, despite reports are used for ATCComm and 4DTBO 2) No re-assessment of Perf Specs for ENR-2.

chogan
Download Presentation

ADS-C OPA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ADS-C OPA WG78/SC214 Sub-group meeting13-17 Feb 12

  2. RSP Specifications ADS-C OPA: Annex G • Different RSP Specs: • ENR-1/TMA/APT 1) • ENR-2 2) • 1)ENR-1/TMA/APT, Perf Spec labelled as ‘RSP’, despite reports • are used for ATCComm and 4DTBO • 2) No re-assessment of Perf Specs for ENR-2 • Requirements and Recommendations (Rec) • ‘Rec’ for ACSP, ATSU, Initiator, Recipient • GOLD format: • Perf Specs for ATSP, AO, AC System and ACSP (mainbody) • includes statements on means of compliance

  3. Commonalities of RSP Specs Exponential Approach for timing Allocations (99.9% and 95%) Timings Specification Same ADS-C Generation Time Same Aircraft and ATSU system timings Availability Specification for ACSP, ATSU: Efficiency and Safety

  4. Main Differences Timings for ACSP ENR-1/TMA/APT: short (as for CPDLC) ENR-2: long (satcom) • RSP Specification • ENR-1/TMA/APT: • Single/1stPeriodic/Baseline report • Next Periodic/Event report  Needed? • ENR-2: • Next Periodic/Event report

  5. RSP TRN Reaction TSD for ADS-C - Demand/Periodic/Event Contract AIRCRAFT ATSU ACSP Controller ATSU System Comm. service Aircraft System FMS (Initiator) Composition ADS-C Request (Demand/Periodic/Event) Generation ADS-C report RSTP Positive Ack Single/1st Periodic/ Baseline report Recognition (Initiator) Event/Periodic Timeout Generation ADS-C report Composition (Initiator) RSP Next Periodic/ Event Report RSTP=TRN Recognition (Recipient)

  6. RSP Specification: ENR-1/TMA/APT • Based on 2Kbyte EPP report: • Basic data + 20 waypoints with EPP data RSP Specification: RSP120 for Single/1st Periodic/Baseline Time-out at 100 seconds for controller RSP95 for Next Periodic/Event Needed? See Annex G - G.5.1

  7. RSP Specification: ENR-2 Based on existing docs: ED122 and GOLD v1.0 • RSP Specification: • For Next Periodic/Event only • RSP180 and RSP400 • Timing allocations differ from GOLD (now Expon approach) See Annex G - G.5.2

  8. ENR-1/TMA/APT: RSP95 & RSP120 (1) ADS-C Generation GND Timer ADS-C Generation

  9. ENR-1/TMA/APT: RSP95 & RSP120 (2)

  10. ENR-2: RSP180 (‘78/214’) & RSP180 (GOLD-v1) ADS-C Generation

  11. ENR-2: RSP400 (‘78/214’) & RSP400 (GOLD-v1) ADS-C Generation

  12. ENR-2: RSP180/400 & RSP180/400 same in WG78/SC214 and GOLD-v1)

More Related