20 likes | 120 Views
Concept graphic. Title (Development). Science Objectives: Associated RFAs:. Mission Implementation Description: *Estimated launch date and prime/extended mission duration *Number of spacecraft *Location (LEO, Geosynch, L-1, lunar, etc) *Attitude control (spin vs 3-axis stabilized)
E N D
Concept graphic Title (Development) Science Objectives: Associated RFAs: Mission Implementation Description: *Estimated launch date and prime/extended mission duration *Number of spacecraft *Location (LEO, Geosynch, L-1, lunar, etc) *Attitude control (spin vs 3-axis stabilized) *Number of instruments *Type of instrument(s) (in situ, remote, TRL-level) *Payload resources required (mass/pwr/tlm) Measurement Strategy: • Enabling and Enhancing Technology Development: • Participating Agencies and International Involvement: • Heritage Missions: http://missionsite.esa.int For more information please contact: I.M. Scientist
Title (post-launch) Concept graphic Science Objectives: Instrumentation (in situ, remote, TRL-level) and Measurements: Science Programs and Current Activities: International Contributions and Collaborations: Data Access: Mission Description: *Launch date and prime/extended mission duration *Number of spacecraft *Location (LEO, Geosynch, L-1, lunar, etc) *Attitude control (spin vs 3-axis stabilized) *Payload resources required (mass/pwr/tlm) Mission Status: http://missionsite.esa.int For more information please contact: I.M. Scientist