Continuous Cross-Border Implicit Intraday Trade Status update

Continuous Cross-Border Implicit Intraday Trade Status update. XXI. Florence Forum Dec 05th , 2011. Content. Setting Joint TSOs and PXs approach Technical solution Roadmap As an example: NWE Implementation Projects. Setting. Member X. Member Y. Local Order Book A.

chynna
Download Presentation

Continuous Cross-Border Implicit Intraday Trade Status update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Continuous Cross-Border Implicit Intraday TradeStatus update XXI. Florence Forum Dec 05th , 2011

  2. Content • Setting • Joint TSOs and PXs approach • Technical solution • Roadmap • As an example: NWE Implementation Projects

  3. Setting Member X Member Y Local Order Book A Local Order Book A SOBF CMM TSO A TSO B • The target model for intraday is acknowledged by all stakeholders: Continuous implicit allocation • Europex and ENTSO-E are committed to implement a pan-European cross-border Intraday mechanism: • A Shared Order Book (SOB), performing continuous cross-border implicit intraday matching, and • A Capacity Management Module (CMM) allocating the cross-border intraday capacity in a continuous manner • Objective: Pooling of intraday liquidity to maximize economic benefit in capacity allocation

  4. Joint TSOs and PXs approach • Europex and ENTSO-E agreed on a joint approach which provides a robust solution for the Interim and a clear path for a smooth transition towards the Target Model • Interim Solution: Aim to cover at least NWE by end 2012, but open to other Regions • ELBAS-like technology amended with an explicit access where requested by NRAs • Responsibility shared between PXs and TSOs • Local Implementation Projects • Target Model: Launch by end of 2014 • Memorandum of Understanding will be signed by TSOs and PXs in order to create the framework and to establish technical and governance principles

  5. Technical solution Interim (Integrated SOB/CMM functions) • All cross-zonal capacity will be allocated though the platform • Regional auctions may complement the implicit continuous mechanism and has to be coordinated with and linked to the solution • Explicit access (OTC and balancing) provided by SOB/CMM platform, if regulatory requested and under TSO terms of access Enduring For the Enduring Solution all products should be matchable through the SOB, subject to consistent arrangements (e.g. nomination, settlement and imbalance rules) and regulatory approval

  6. Roadmap 2011 2012 2013 2014 MoU ENTSO-E - Europex TSO specification TSO requirements CMM/SOB concept Clearing andsettlement Interim Solution Localimplementation Go-Live Design Phase Enduring Solution Implementation Go-Live

  7. As an example: NWE Implementation Projects for the Interim • The local / multi-party projects will aim to change the current capacity allocation mechanism on several NWE borders into an Elbas-like mechanism • Open to other borders or regions when ready Implicit and explicit continuous capacity allocation Explicit continuous capacity allocation Explicit capacity allocation No capacity allocation

  8. Thanks for your attention!