1 / 12

Summary of Uplink Status

Summary of Uplink Status. D. Teyssier, ESAC On behalf of the AIV/ILT team. Uplink tools: status of CUS scripts. Improved safety/configuration control: CUS releases go through systematic test-harnesses

ciaran-fry
Download Presentation

Summary of Uplink Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of Uplink Status D. Teyssier, ESAC On behalf of the AIV/ILT team

  2. Uplink tools: status of CUS scripts • Improved safety/configuration control: • CUS releases go through systematic test-harnesses • first level: purely software – check that scripts can run through in “all” (most) possible calls foreseen in the ILT (some 1200 calls tested) • second level: in combination with real ICU (i.e. OBS and MIB) and backends (parallel setup) on a subset of first level harness scripts – check acceptance of commands, data-rate, timing, real-time packet content (QLA), tuning procedures, etc. • Special content of CUS (LO deliveries: safety tables, LCU patches, cf T. Klein’s talk) checked through complete acceptance procedure – check correct upload to ICU and LCU Summary of Uplink status

  3. Uplink tools: status of CUS scripts • Improved safety/configuration control: • Extensive use of parallel setup (ICU CFM2, FCU-TU5, FPU dummy, QM backends-H, QM-chopper, no LO yet). • exercise new TCs and modes (dry run) before use on FM, use of QLA, debug of OBS and MIB • populate database with representative sequences of BBIDs – “real” data for DP-tool preparation • efficient teaching for operators and backup personnel • CUS scripts and the multi-band/-frequency context: • Standard scripts now combined into tcl-based scripts • allow loop on parameters/frequencies • allow un-attended testing (typically at night) for long measurement sequences (e.g. stability) Summary of Uplink status

  4. CUS scripts: completeness • CUS script readiness • As of TRR (mid-Aug 06), no scripts to handle LO operations, most tuning scripts missing, no AOT testing • As of today (see also appendix in hands-out) • LOU/LSU operation under control (both configuration tables and commanding scripts/procedures) • Magnet tuning extensively exercised • new (faster) diplexer scan TC implemented • Remaining open items • LO automatic tuning (to be closed this week) • AOT test scripts (procedures and scripts close to completion, to be delivered this week) • peak-up Summary of Uplink status

  5. CUS scripts: beyond the ILT • CUS scripts: use for AOT CUS • Since this summer, the AOT CUS backend (resp. V. Ossenkopf) contains the instrument commands used in ILT • scripts used in common for ILT and AOT CUS maintained and configuration controlled under one single CVS directory • AOT CUS always uses most up-to-date knowledge of instrument commanding • Representative overheads for instrument configuration and tuning accounted in HSPOT time estimates • Similarly, ILT CUS handles backend readouts (data-rate) in the fashion planned for AOT: permanent validation Summary of Uplink status

  6. CUS scripts: beyond the ILT • CUS scripts: re-use in future phases • Sub-set of current CUS scripts has already been turned into the reference scripts for IST • test procedure for IST close to completion (draft document exists, resp. B. Colleaudin) • Currently, assessment of additional time needed to recover from LO upgrade consequences in IST • Objective is to have scripts allowing quick instrument characterisation at any phase (incl. commissioning and routine) Summary of Uplink status

  7. APPENDIX: FM-ILT CUS status Summary of Uplink status

  8. APPENDIX: FM-ILT CUS status Summary of Uplink status

  9. APPENDIX: FM-ILT CUS status Summary of Uplink status

  10. APPENDIX: FM-ILT CUS status Summary of Uplink status

  11. APPENDIX: FM-ILT CUS status Summary of Uplink status

  12. APPENDIX: FM-ILT CUS status Summary of Uplink status

More Related