Draft 5000.02 The Defense Acquisition Management Framework. PIR. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits Analysis. Draft 5000.02 Requirements and Acquisition Process Flow. ICD Initial Capabilities Document MDD Materiel Development Decision

cili
Download Presentation

Draft 5000.02 The Defense Acquisition Management Framework .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Draft 5000.02 The Defense Acquisition Management Framework. PIR Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits Analysis CCA LSS Support Slides

  2. Draft 5000.02Requirements and Acquisition Process Flow. ICD Initial Capabilities Document MDD Materiel Development Decision AoA Analysis of Alternatives DAB Defense Acquisition Board CDD Capability Design Document CPD Capability Production Document EMDD Engineering and Manufacturing Development and Demonstration CCA LSS Support Slides

  3. Developing, Delivering and Verifying Capability DOTLPF Plan and Execute Change of Processes and Culture Post Implementation Review (PIR) Assesses Outcome Of Investment By Measuring MOEs Capability Based Analysis Establishes Need and MOEs that Define Need Fulfillment MDD CBA FRPD A B C FOC IOC PIR Develop System Requirements, Acquire System and conduct OT&E on Key Performance Parameters (KPPs) CCA LSS Support Slides

  4. Select Control Analyze Evaluate Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support Concept Development Concept Decision MS A MS B MS C/FSDD 8. GIG 9. IA Strategy 10. Modular 11. Registration 12. PIR Plan Capability Based Assessment 12. PIR CPD ICD CDD IOC FOC DOT&E MDA CCA MDACCA FCB MDA CCA Update MDA JROC JROC JROC 5. AoA 6. EA 7. Acquisition Measures 1. Core Function Need to be Performed by Gov 2. Outcome-based Performance Measures 3. BPR 4. No Private or Gov better CCA in the JCIDS & Acquisition Management Systems CCA LSS Support Slides

  5. PIRD CPD CCA Elements in the JCIDS CBA Process 1. Provides fundamental tasks and measures required for CBA 3. Output is needed capabilities and their associated tasks, attributes & standards (MOEs) 2. Facilitates development of measures of effectiveness (MOEs) 13. PIR Informs JCIDS Process 4. Identifies functional area metrics and identifies MOEs 12. IT Architecture will contain MOEs & MOE measures 5. Core function need to be performed by government 11. Reports MOEs but no Change Management Project 6. Summary of FAA/FNA Includes MOEs 10. Initiates non-materiel Change Management Project 7. Change Management Analysis & Benchmarking 9. May satisfy as AIS AoA 8. No private or other government organization better performs function CCA LSS Support Slides

  6. FCB/Sponsor MOEs PIR Plan ICD FCB: Functional Capabilities Board ICD: Initial Capabilities Document CDD: Capability Development Document CPD: Capability Production Document MOE: Measure of Effectiveness PIR CDD TEMP FOT&E CPD • Platform Readiness Assessments • CC Exercise results • User Satisfaction Surveys • Annual CFO Report Input • Mission Readiness Assessments • ROI Computation • War Games OT&E TEMP Contract DT&E SEP Build Integration & Test MS A MS B MS C IOC PIR FOC PIR in the Defense Acquisition Lifecycle CCA LSS Support Slides

  7. Requirements and Acquisition Process Depiction with PIR Feedback Loop PIR PIR PIR CCA LSS Support Slides

  8. Problem Space CBA FCB/PSA Verification of Business Need MOEs PIR Plan PIR ICD Verification of Solution CDD TEMP CPD OT&E TEMP Contract DT&E Solution Space SEP Build Integration & Test Life Cycle of a DoD Business Need FCB: Functional Capabilities Board ICD: Initial Capabilities Document CDD: Capability Development Document CPD: Capability Production Document DT&E: Development Test OT&E: Operational Test PIR: Post-implementation Review CCA LSS Support Slides