Electrophotographic Development and Transfer Station Update

Electrophotographic Development and Transfer Station Update. Week 2 Progress Report Ben Nguyen Dan Prosser Adam Regu la Steve Snyder Amar Mohamed. Project Description. Produce a LabView controlled, xerographical fixture that puts toner on paper. 

cirila
Download Presentation

Electrophotographic Development and Transfer Station Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electrophotographic Development and Transfer Station Update Week 2 Progress Report Ben Nguyen Dan Prosser Adam Regu la Steve Snyder Amar Mohamed

  2. Project Description • Produce a LabView controlled, xerographical fixture that puts toner on paper.  • The LabView user interface should contain graphical outputs from the fixture, as well as, controls for multiple inputs. • This project is a continuation of P09503. • Customer: • Marcos Esterman (RIT) • John Knapp (Xerox)

  3. Device Description • Contains 5 subsystems • Charging Station: Applies a uniform charge to the photoreceptor • Exposure Station: Shines light on the photoreceptor to remove charge from the imaged area • Development Station: Applies charged toner particles to the photoreceptor • Pre-Transfer Erase Station: Reduces photoreceptor charge to uniform value • Transfer Station: Transfer toner from photoreceptor to paper

  4. Customer Needs • Need 1 Must be operational • 1.1 Put toner on paper • 1.1-1 All subsystems functional • 1.1-2 Further optimization of subsystems • 1.2 Able to be used for educational purposes • 1.2-1 Also possibility for R&D • Need 2 Safety • 2.1 Voltages, etc. • 2.2 Safety measure for stepping motor • 2.2-1 Make sure velocity is controlled • 2.2-2 Put in LabView/physical stopgaps to protect from improper operator input • Need 3 Interface • 3.1 Voltages/Velocities, etc. controllable by VI front panel • 3.2 Certain metrics should be plotted and monitored

  5. Project Manager: Lam Nguyen, Jr. (Ben) • Meeting Time: weekly Monday 8pm-10pm • Roles • Ben: Interface Design, Safety • Dan: Controls, Mechanical Testing • Steve: Controls, Back-End • Adam: Fixturing, Electromechanics • Amar: Wiring Expert, Safety • Jeff: LabView Expert (Master’s student) • Knowns • Issues the previous team had • The components that have already been completed • Goal of end product (teaching purposes, R&D) • General overview of the system operation • Unknowns • Plan of attack • Work breakdown structure • Technical knowledge • Subsystem team leads • Bill of materials

  6. Look Ahead • No current issues with meeting deliverables • Future Plans • Risk identification • Begin investigating operation of current machine • Determine need for new equipment (BoM) • Determine subsystem team leads • Quantify scope of work • Develop plan-of-attack • Confirm/clarify customer needs