1 / 5

RESONANT GROUNDING versus LOW IMPEDANCE GROUNDING

RESONANT GROUNDING versus LOW IMPEDANCE GROUNDING. Neutral Point Treatment Application Survey. Neutral point treatment in Germany *. Resonant grounding is also applied in: Scandinavia numerous Central European countries Eastern Europe. * VDEW Störungsstatistik 1998. L 3. V 3N. L 2.

claude
Download Presentation

RESONANT GROUNDING versus LOW IMPEDANCE GROUNDING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RESONANT GROUNDING versus LOW IMPEDANCE GROUNDING

  2. Neutral Point TreatmentApplication Survey Neutral point treatment in Germany * Resonant grounding is also applied in: • Scandinavia • numerous Central European countries • Eastern Europe * VDEW Störungsstatistik 1998

  3. L3 V3N L2 N V2N L1 V1N CE CE CE IL IC V1E V2E V3E V0 I2 I3 Voltages during earth fault L3 L2 V2N V3N N V2E V3E V0 = V1N I3 L1=E IL IC L1 I2 Resonant GroundingBasics - Theory E Ires / IC d undercompensation overcompensation

  4. EPSY - Earth fault Protection SYstemSystem Components Earth Fault Compensation Controller Earth Fault Detection Arc Suppression Coil(ASC)

  5. Resonant GroundingComparison 100 % Earthfaults Resonant grounding • 70 ... 80 %transient faults • self-extinction by the ASC • no influence on power supply Low impedance grounding • 20 ... 30 % steady faults • low fault current - increased human safety - reduced damage - reduced interference - reduced earthing effort - high fault current (e.g. 2 kA) - immediate tripping high number of power interruptions quality of power supply increased

More Related