MM VITAOILS SDN BHD: SHARING EXPERIENCE ON CLEANER PRODUCTION PROJECT IMPLEMENTATION. DEPARTMENT OF ENVIRONMENT – UNIVERSITY OF MALAYA – MM VITAOILS. MM VITAOILS SDN BHD . . LOT 3, PERSIARAN PERUSAHAAN, SECTION 23, 40300 SHAH ALAM, SELANGOR.
E N D
MM VITAOILS SDN BHD: SHARING EXPERIENCE ON CLEANER PRODUCTION PROJECT IMPLEMENTATION DEPARTMENT OF ENVIRONMENT – UNIVERSITY OF MALAYA – MM VITAOILS
MM VITAOILS SDN BHD. LOT 3, PERSIARAN PERUSAHAAN, SECTION 23, 40300 SHAH ALAM, SELANGOR
CP COLLABORATION CEREMONY – DEMONSTRATION PROJECT MM VITAOILS SDN BHD IS BEING SELECTED AS A CLEANER PRODUCTION IMPLEMENTATION DEMONSTRATION PREMISE FEB 22ND 2010
CP INTRODUCTION AND AWARENESS PROGRAMS MARCH 2010 CLEANER PRODUCTION INTRODUCTION AND AWARENESS PROGRAMME WERE CONDUCTED AT MM VITAOILS PREMISE TO ALL STAFF
CP IMPLEMENTATION - ACTIVITIES APRIL 2010 • AUDIT ACTIVITIES BY THE CONSULTANT • BRAINSTORMING SESSION FOR CP PROJECT OPTION
CP AUDIT / PROJECT FINDINGS MAY 2010 NOTE : CATEGORY OF THE AUDIT WILL BE BASE BY 7 TYPES
CP AUDIT IMPLEMENTATION JUNE 2010 TRANSPARENT ROOFING IS USED AT THE PRODUCTION AREA USING SUFFICIENT LIGHTING DURING DAY TIME TANKS IS USED TO COLLECT RAIN WATER FOR THE FACTORY FLOOR CLEANING
CP PROJECT IMPLEMENTED CP IMPROVEMENT # 1 TO INSTALL BYPASS PIPING AT THE CHILLING PROCESS BEFORE NEED TO SWITCH ON FOR THE CHILLING PROCESS DURING PRODUCTION AFTER THE NEW PIPING IS BY PASS THE CHILLING PROCESS AND DID NOT NEED TO SWITCH ON CHILLING PROCESS
CP PROJECT IMPLEMENTED CP IMPROVEMENT NO # 2 TO CHANGE MANUAL TO AUTO PROCESS BY INSTALLATION OF PNUEMATIC CONTROL VALVE EQUIPMENT BEFORE: TIME SPENT FOR WALKING IS 5 MINUTES TO THE WORK PLACE AFTER ELIMINATE TIME SPENT TO WALK FROM THE OPERATION ROOM TO THE WORK PLACE
CP PROJECT IMPLEMENTED CP PROJECT 3 IMPROVE HOMOGENOUS CYCLE BY INCREASE PIPING DIAMETER FROM 1.5 INCH TO 2.0 INCH PER CYLE IS 20 MT BEFORE : 1 HR PER CYCLE FOR 20 MT AFTER : 45 MINUTES PER CYCLE
CP PROJECT IMPLEMENTED CP PROJECT NO # 4 TO IMPROVE PROCESS CYCLE FROM MANUAL HANDLING TO SEMI AUTOMATIC HANDLING BEFORE PROCESS CYCLE IS TO SEAL CARTON BOX IS 30 SECONDS AFTER PROCESS CYCLE IS TO SEAL CARTON IS 15 SECONDS
CP PROJECT IMPLEMENTED CP PROJECT : PROJECT NO # 5 TO IMPROVE MOTOR AND PUMPS EFFICIENCY BEFORE USING THE PUMPS AND MOTOR WITH 80% EFFICIENCY AFTER USING THE PUMPS AND MOTOR WITH 90 % EFFICIENCY
CP INITIAL NOISE MONITORING INTIAL NOISE MONITORING PROGRESS WHICH IT IS TO FULLFILL DEPARTMENT OF SAFETY AND HEALTH (DOSH) REQUIREMENT UNDER FACTORY AND MACHINERY ACT ( NOISE EXPOSE) REGULATION AT SEPT 2010
CP AUDIT RESULT Note: List of option based on 7 types
CP CONCLUSION THE IMPLEMENTATION OF THE CP IS A "MILESTONE" IN MAKING MMVITAOILS PLANT IS MORE ENVIRONMENTALLY FRIENDLY AND AS A CORPORATE SOCIAL RESPONSIBILITY. WE ARE SATISFIED WITH THE COMMITMENT AND COOPERATION SHOWN BY THE DEPARMENT OF ENVIRONMENT AND UPUM IN THIS PROGRAM. MM VITAOILS IS CONVINCED THAT THE CONCEPT OF CP IS IDEAL FOR MM VITAOILS AND FOR THE INDUSTRAIL ACTIVITIES.
CP PRESENTATION TERIMA KASIH Q & A