1. Ó Galorath Incorporated 2005 1 SEER: The Current Statepresented to NASA CAS 2005
2. 2 Ó Galorath Incorporated 2005 Galorath Mission Statement Help engineers, managers and cost analysts plan and control critical projects with advanced modeling tools and services:
This is accomplished by providing:
1. SEER software for management planning & control and for cost analysis;
2. User training in tool implementation and methodology to enhance decision making and process refinement
3. Product tailoring to meet customer specific requirements
4. Management planning, control and cost services to assist in the implementation of the tools and methodologies
SEER: Empowering project estimation, planning & control
3. 3 Ó Galorath Incorporated 2005 SEER Products Provide Complete Total Cost of Ownership Solutions SEER-H with Total System Vision
Estimate and Analyze the Development, Production, Operations & Support and System Level Costs
Integrating your SEER-SEM (software) and SEER-DFM (detail production) estimates into a single project rollup with complete associativity
The SEER Software Estimation and Project Control Suite
Estimate and Analyze the Development and Maintenance of Software Projects with respect to Cost, Schedule, Effort, Risk and Reliability
SEER-DFM (Design for Manufacturability)
Estimate and Analyze Detail Production Costs – Part Labor Costs, Tooling Costs, Material Costs
4. 4 Ó Galorath Incorporated 2005 SEER Products SEER Lifecycle Cost Evaluation
SEER-H with Total System Vision
SEER-Spyglass
SEER-IC
The SEER Software Estimation and Project Control Suite
SEER-SEM (Software Estimation Model)
SEER-AccuScope
SEER-SEM Client for MS Project
SEER-PPMC (Parametric Project Monitoring and Control)
SEER-ScatterPlot
SEER-ProjectMiner
SEER-DFM (Design for Manufacturability)
Machining
Mold/Cast/Forge
Finishing
Electrical Assembly
Printed Circuit Board Assembly
Mechanical Assembly
Fabrication
3 Levels of Composites
SEER-RateMaker
5. 5 Ó Galorath Incorporated 2005 What Does SEER-H Estimate? System Level Cost Estimation
System program management
System engineering and integration
System test operations
System integration, assembly and test
System support equipment
Development Estimation
Design
Prototypes
Tooling
Production Estimation
Direct Labor--fabrication, integration, assembly
Indirect Labor-
production support, overhead, Management, etc.
Material--raw materials, purchased components
Operations & Support Scenario Estimation
Program schedule
Product reliability
Product maintainability
Product availability
6. 6 Ó Galorath Incorporated 2005 System Level Costs System Level Cost analysis can be added to your SEER-H estimate by setting parameters at the project or rollup level.
When applied, it takes into account all child work elements (including software) in every branch that leads to the rollup.
It considers these work elements to be collectively designed to fulfill a common, non-trivial purpose, preparation for which requires incurring costs above and beyond their standalone costs and the costs of creating the appropriate interfaces for the individual elements.
System Level Costs use the labor and material costs of the subsystems along with system level complexity factors to compute system level costs.
System level costs are reported for both recurring and non-recurring activities.
7. 7 Ó Galorath Incorporated 2005 System Level Cost - Outputs SLC: An initiative to incorporate system level costs into SEER-H
Purpose: to allow estimators to include both subsystem and system level costs in a single estimate
Initial data research effort funded by NASA IPAO
Main source of data: NAFCOM 2002 database
Other sources: Industry survey, in-house data and expert opinion
Up to five distinct system level cost increments can be estimated (or omitted if deemed inappropriate) in development:
System program management (SPM)
System engineering and integration (SEI)
System test operations (STO)
System integration, assembly and test (IAT)
System support equipment (SSE)
Up to three distinct system level cost increments can be estimated (or omitted if deemed inappropriate) in production: SPM; SEI; IAT
8. 8 Ó Galorath Incorporated 2005
9. 9 Ó Galorath Incorporated 2005
10. 10 Ó Galorath Incorporated 2005 What is SEER-DFM? Bottoms –Up Parametric Cost Model
Based on Standards
Parametric Forecasting
Estimates At the Process Level
Estimates Average Unit and Total Production costs
Labor
Material
Tooling
Bases Estimates on Process Parameters
Part Size, Process Types and Steps, Lot Size, Etc.
Provides Design Team with the ability to make smart decisions from the “Back of the Napkin” to the CAD Program Phases,
Which Reduces Downstream Manufacturing Costs
Provides the Design Team with Real Time Cost Feedback
Provides a Systematic Repeatable Estimating Process
Reports Production Cost estimates in a variety of formats
11. 11 Ó Galorath Incorporated 2005 What Does SEER-DFM Estimate?
12. 12 Ó Galorath Incorporated 2005 Basic SEER-DFM Manufacturing Processes
13. 13 Ó Galorath Incorporated 2005 Basic SEER-DFM Manufacturing Processes (cont.)
14. 14 Ó Galorath Incorporated 2005 What Does SEER-SEM Do? SEER-SEM uses a combination of:
Sizing metrics and techniques (SLOC, Function Points and others),
Parametric algorithms
Knowledge Bases (industry data),
Simulation-based probability analysis techniques, and
User supplied data
to estimate and analyze the development and maintenance of software projects…
with respect to
Cost
Schedule
Effort
Risk (probability of success)
Reliability (Defects)
15. 15 Ó Galorath Incorporated 2005 SEER: Process Focus (CMMI) Project Planning
Establish Estimates
Develop a Project Plan
Obtain Commitment to the Plan
Project Monitoring and Control
Monitor Project Against Plan
Manage Corrective Action to Closure
Measurement and Analysis
Align Measurement and Analysis Activities
Provide Measurement Results
16. 16 Ó Galorath Incorporated 2005 SEER: Methods Project Planning
History-Based Sizing
Direct Measure Sizing
Parametric Estimation
Project Monitoring and Control
4-D Performance Measurement
At-a-Glance Status Indication
Performance-based Prediction
Measurement and Analysis
Estimation Accuracy Assessment and Improvement
Calibration
Knowledge Base Management
Benchmarking
17. 17 Ó Galorath Incorporated 2005 SEER: Tools Project Planning
SEER-AccuScope
SEER-SEM
Project Miner (SEER-SEM option)
SEER-H
SEER-IC
SEER-DFM
SEER-SEM Client for Microsoft Project (SEER-SEM option)
Project Monitoring and Control
Parametric Project Monitoring and Control (SEER-SEM option)
Measurement and Analysis
SEER-RDB
SEER-ScatterPlot (SEER-SEM option)
Databases
SEER-DB
SEER-RDB
18. 18 Ó Galorath Incorporated 2005 A Common Question In SEER-SEM, can I enter my actual effort once the project is underway and will the tool recalibrate my estimate?
The right answer is NO - it’s not enough just to give actual hours
Just because you spent 50% of a planned budget doesn’t mean your are 50% done
What the project manager needs to know:
How much more money, how many people, for how long?
How can the project be adjusted to meet objectives?
To do this, you need assess the project status in terms of progress, not just in terms of expenditure
19. 19 Ó Galorath Incorporated 2005 Software Project ManagementFully Managed Project
20. 20 Ó Galorath Incorporated 2005 What is PPMC?Features
A set of add-on features to SEER-SEM that enable project monitoring and control of software development projects
Features include:
Inputs for actual effort and project progress as well as for certain project metrics
Performance Measurement calculations
Reporting to provide information on project status
PPMC employs 4-D Performance Measurement
Activity Completion
Expenditures
Artifact Completion
Defect Discovery/Removal
21. 21 Ó Galorath Incorporated 2005 Why PPMC?Benefits
Performance Measurement is considered a best practice for monitoring and controlling software projects
Performance Measurement can be improved:
More fidelity in determining progress (Earned Value)
Better prediction and re-baselining capability by coupling to-date performance with established estimation methods
PPMC adds monitoring and control capabilities to SEER-SEM by combining:
Accepted algorithms currently used for cost and schedule estimation during the project planning process
Accepted equations currently used for traditional Performance Measurement
22. 22 Ó Galorath Incorporated 2005 Performance Measurement:Measures and Metrics Fundamental Cost of Work Measures
Baseline Budget – Budget at Completion (BAC)
Planned – Budgeted Cost of the Work Scheduled (BCWS)
Earned – Budgeted Cost of the Work Performed (BCWP)
Spent – Actual Cost of the Work Performed (ACWP)
Variances (Differences between Cost of Work Measures)
Schedule Variance (SV)
Cost Variance (CV)
Budget Variance (BV)
Time Variance (TV)
23. 23 Ó Galorath Incorporated 2005 Performance Measurement:Measures and Metrics Performance Indices – (Ratios Between Cost of Work Measures)
Schedule Performance Index (SPI)
Cost Performance Index (CPI)
Budget Performance Index (BPI)
Time Performance Index (TPI)
Composite Performance Index (XPI)
To-Complete Performance Index (TCPI)
Status and Forecasting Metrics
Estimate at Completion (EAC)
Estimate to Complete (ETC)
24. 24 Ó Galorath Incorporated 2005 Tracking a Project Once a project is started, the PPMC process may begin
Start with a SEER-SEM “Current Estimate”
Upon approval, make the “Current Estimate” the Baseline
Measure project progress and expenditure periodically and/or aperiodically and record data “Snapshots”
At each “Snapshot” point in time:
Analyze all of the various Performance Measurement metrics and indicators and identify potential problems
Report analysis findings to stakeholders
Replan (revisit the estimate) as required
Modify “Current Estimate” in SEER-SEM until it reasonably matches actual progress (BCWP) and actual expenditure (ACWP) to date
Upon approval, save the current Baseline and then make the “Current Estimate” the new Baseline
25. 25 Ó Galorath Incorporated 2005 The Baseline A baseline freezes the current estimate
The baseline provides the yardstick against which the project is tracked and evaluated
Allows you to do trades with the current estimate while maintaining the planning baseline
A baseline can be updated at any time
The current estimate may be set back to the baseline at any time
26. 26 Ó Galorath Incorporated 2005 The Snapshot Snapshots are a picture of the project’s metrics at any give point in time
The snapshot includes two key components:
Work Complete
Actual Effort
Work Complete describes the progress in terms of milestone completion
Actual Effort includes hours as well as size and defect metrics
Snapshots are flexible in terms of interval or frequency
Regular snapshots – e.g. monthly or quarterly
As needed – e.g. before a key review
27. 27 Ó Galorath Incorporated 2005 Reporting PPMC reports and charts are based on the most recent snapshot entered
Work complete metrics are used to evaluate remaining effort and schedule (Estimate To Complete)
Estimate At Complete = Actual Effort + ETC
28. 28 Ó Galorath Incorporated 2005 Example Project: Metrics Charts at Project Start (Initial Plan)
29. 29 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Software Requirements Review
30. 30 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Preliminary Design Review
31. 31 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Critical Design Review
32. 32 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Code & Unit Test Complete
33. 33 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Component Integration Complete
34. 34 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Program Test Complete
35. 35 Ó Galorath Incorporated 2005 Example Project: Metrics Chartsat Delivery
36. 36 Ó Galorath Incorporated 2005 PPMC: Summary Enables powerful evaluation of a project’s progress
Utilizes Performance Measurement best practices
Capitalizes on parametric model’s ability to replan and forecast based on current project assumptions
Flexible – doesn’t require regular care and feeding, you can use it only when you need to
Provides a significant contribution to the project management continuum
37. 37 Ó Galorath Incorporated 2005 SEER TRAINING SEER-H and SEER-SEM
Core Training
3 Days of presentation, discussion and extensive hands-on
exercises and case studies
Public Workshop – available quarterly (Galorath HQ – El Segundo, CA)
Private (on-site)
Advanced Training
2 Days more sophisticated use of the tools, integration and
customization as well as introductions to specialized SEER add-ons
Public Workshop – available quarterly (Galorath HQ – El Segundo, CA)
Private (on-site)
SEER-DFM
4 to 5 Days of presentation, discussion and extensive hands-on
exercises and case studies
Private (on-site)
38. 38 Ó Galorath Incorporated 2005 SEER PROFESSIONAL SERVICES The mission of our Professional Services branch is to ensure our customer’s success by providing world-class capabilities in the application of Galorath products to real-world projects.
QuickStart Assessment (QSA)
Implementation Services
JumpStart Program *
Estimating and Proposal Support
Independent Cost Estimation
Custom Modeling Solutions
* NASA has prepaid JumpStarts available.