STATE JOINT STOCK COMPANY UZBEKENERGO ГОСУДАРСТВЕННО-АКЦИОНЕРНАЯ КОМПАНИЯ «УЗБЕКЭНЕРГО»
THE COMPANY MANAGEMENT Deputy Prime Minister, Chairman of Council First Deputy Minister of Economy Deputy Minister of Finance The Company Council First Deputy Chairman of Property Committee First Deputy Chairman for the Uzbekneftegaz Deputy Chairman for Demonopolization Committee Reps of the Ministry of Justice First Deputy Chairman for the Central Bank Rep of the Cabinet of Ministers
General information The Company consists of 54 enterprises and organizations, including 41 Open Joint-Stock Companies, 11 Unitary Enterprises and 2 LLC. The installed capacity of the Power Plants is 12000 MW (10600 MW – TPP; 1400 MW- HPS). Electricity Generation, in 2008 – 49.4 TWh; 2009 – 49.7 TWh; Thermal Power Plants generate 90% of electricity; Hydro Power Plants – 10%). Network length exceeds 238.5 thousand km. Installed capacity of the transformers is 37967 MVA at 35-500 kV substations.
Sector development The Presidential Decree, dated March 12, 2011 Program of measures on realization of the major projects on modernization, technical and technological re-equipment of the industry in 2009-2014. 37 investment projects in the electricity sector.
Tariff level Electricity 2003 2005 2010 14.32 sum/kWh 34.5 sum/kWh 76.8 sum/kWh (4.7 cent/kWh) Heating 2009 2010 278 sum/m2 397 sum/m2 Hot water 891 sum/m3 1,272 sum/m3
The List of Priorities On-going and completed projects: 1. Construction of Combined Cycle Power Plant at Tashkent TPP – 370 MW; 2. Construction of 500kV line Syrdarya - Sogdiana (2nd circuit)- 217 km; 3. Constriction of the 500 kV line Guzar – Syrkhan – 197 km; 4. Construction of s/s 500kV Uzbekistanskaya with cutting-in 500 kV line Novoangrenskaya – 16.2 km. New projects: 1.Construction of Combined Cycle Power Plant at TalimardjanTPP– 740 MW; 2.Construction of Combined Cycle Power Plant at Navoi TPP– 370 MW; 3. Implementation of the SCADA system – 12.8 thousand terminal in up to 6kV networks. Planning projects: 1. Construction of 500kV line Talimardjan - Sogdiana - 218 km; 2. Construction of 500kV line Syrdarya – Novo-Angren- 150 km; 3. Construction of Hydro Power Stations – around 330 MW
Investors/Donors Asian Development Bank; Islamic Development Bank; JICA; European Bank for Reconstruction and Development; World Bank.
Uzbekenergo and CAPG • On December 1, 2009, Uzbekistan officially withdrew from the Central Asian Unified Power System; • Uzbek Power System disconnected with the Tajik Power System; • Uzbekistan informally works in parallel operation with Kazakhstan and Kyrgyzstan; • Uzbekenergo provides technical power flows between Uzbekistan and Tajikistan on bilateral agreements.