120 likes | 234 Views
Reserve Capacity RFC 1 Short manual for RC booking. Reserve Capacity RFC1 Search in PCS. Search for Reserve Capacity - Use „ Pre-constructed products “ ( as for PaPs in annual tt) - Select „RFC … (PaPs)“, RFC, Direction , Timetable period.
E N D
Reserve Capacity RFC1Search in PCS Search for Reserve Capacity - Use „Pre-constructedproducts“ (as for PaPs in annual tt) - Select „RFC … (PaPs)“, RFC, Direction, Timetable period
Reserve Capacity RFC 1Overview RC matrix Clicking on “Details” opens the RC details Note: The times are all the same for all operation points
Reserve Capacity RFC 1Prepare new dossier Selected RC sections may be copied to the basket and copied to a new dossier or to an existing dossier (same functions as for PaPs) Basket with RC sections from Antwerp to Gallarate
Reserve Capacity RFC 1Prepare new dossier • Example: Copying RC from basket to new dossier • Same procedure as for annual timetable • Requested RU timetable before inserting first RC section
Reserve Capacity RFC 1Select calendar Enter the operation days. In the example the train will run Tuesday to Friday in June 2014. Note: When asking for days where the RC is not available you will receive warnings
Reserve Capacity RFC 1Select calendar Calendar of RC sections after creating first test dossier: Period 1-7 September no longer available If capacity is not available on days which are still available according to the RC-Calendar on www.corridor-rhine-alpine.eu, please use another RC matrix
Reserve Capacity RFC 1Enter your traffic times After creating the dossier (clicking “create dossier”), the desired departure time has to be entered in the “Comments” field Note: Screenshot was taken after saving the dossier. Comment (desired departure time) is seen as saved and no longer in the “comments” field which is open for other entries
Reserve Capacity RFC 1Harmonisation & submit path request Dossier “Control” after RU harmonisation, before leading RU submits the path request
Reserve Capacity RFC 1Draft offer RUs receiving the offer can compare requested RU TT and offered IM TT
Reserve Capacity RFC 1Acceptance RUs have to change the acceptance indicator … … and with all RU indicators Green Leading RU can click “Accept” Important note: There is no post processing in the ad-hoc process – this is standard PCS process!
Reserve Capacity RFC 1Active timetable Dossier is now in “Active Timetable” phase