An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. McDonald Elementary School 2010-2011 Options

  2. Welcome • Mrs. Keely Mahan – Principal • Dr. Thomas Turnbaugh – Superintendent • Mr. Vic Lasher – Facilities Director • Mr. Mike Preston – Burt Hill Architects • Mr. Damion Spahr – Reynolds Construction Management

  3. Initial Concerns • Safety of students and staff during construction • Accommodation of Davis students into McDonald • Relocation of Bucks County IU classes and placement of all Centennial students to locations within the District • Maintaining quality educational program • Adhering to CSD class size policy

  4. Finish Schematic Design/ Design June 2010 Development Land Development and Nov. 2010 Permitting Act 34 Hearing July 2010 Bid Period Oct. 2010 Award of Bids Nov. 2010 Occupy Sept. 2012 Timeline to Construction

  5. Elementary School Plan: • Renovate Willow Dale Elementary School • Build New Region 2 School @ McDonald Site • Build New Region 1 School @ Davis Site Each School Will: • Accommodate Approx. 950 Students • Be Designed to Accommodate Full Day Kindergarten • Be Designed to Provide Equitable Facilities

  6. Willow Dale Site Plan

  7. Willow Dale Floor Plans 5th 1050 SF 5th 1050 SF STAIR STAIR 2ND 1050 SF 2ND 1050 SF K 1045 SF STO K 1045 SF 5th 1050 SF 5th 1050 SF 2ND 1050 SF 2ND 1050 SF K 1045 SF K 1045 SF 2ND 1050 SF 5th 1050 SF 5th 1050 SF 2ND 1050 SF CORRIDOR K 1045 SF K 1045 SF CORRIDOR CORRIDOR SPEECH 345 SF SPEECH STORAGE STORAGE AUTISM – INTERMED 1050 SF AUTISM - PRIMARY 1050 SF 2ND 1050 SF 4th 1050 SF K 1045 SF K 1045 SF STO NURSE SUITE 650 SF ADMINISTRATION SUITE 2150 SF E.L.L. 1050 SF COMP 1050 SF K 1045 SF 4th 1050 SF 4th 1050 SF JAN. CORRIDOR CORRIDOR STAIR E STAIR E WRKRM TOILET LOBBY VEST TOILET PSYC ART 1090 SF STAGE 1100 SF T G. STO WKRM COMP. 1000 SF ART STO. LIBRARY 2930 SF O MUSIC 1555 SF LRN SUP 630 SF READ RES. 690 SF CORRIDOR ART 1090 SF T GYMNASIUM 3730 SF TOILET STO T MUSIC STO. IPC 700 SF MUSIC 425 SF TOILET STOR T CORRIDOR J OT/PT IPC 525 SF COU 4th 1050 SF 4TH 1050 SF MUSIC 1050 SF CAFETERIA 3745 SF FAC 510 SF LRN SUP 525 SF MECH. 2060 SF CORRIDOR 1ST 1050 SF SE 1050 SF 4th 1050 SF 3rd 1050 SF CORRIDOR CORRIDOR STO COUNS STORAGE KITCHEN 3090 SF OT/PT STORAGE MAINT 560 SF ELEC REC 3rd 1050 SF 3rd 1050 SF 1ST 1050 SF 1ST 1050 SF 3rd 1050 SF 3rd 1050 SF 1ST 1050 SF 1ST 1050 SF 3rd 1050 SF 3rd 1050 SF 1ST 1050 SF 1ST 1050 SF STAIR STAIR Lower Level Floor Plan First Floor Plan

  8. Willow Dale Site Section

  9. Region 2 Site Plan

  10. Region 1 Site Plan

  11. Region 1 and 2 First Floor Plan

  12. Region 1 and 2 Second Floor Plan

  13. Region 1 and 2 Conceptual Massing